Embodiment 1
[0033] An embodiment of the present invention provides an intelligent delineation system, which is used to delineate the upgrade device and the affected device for the reconstruction and expansion of the smart substation, such as figure 1 A schematic structural diagram of an intelligent delineation system is shown, the system includes: a presentation layer 102, a persistence layer 104 and a business layer 106;
[0034] Among them, the presentation layer is used to import new SCD files and reconstructed and expanded SCD files of smart substations; the persistent layer is used to extract device information and virtual circuit connection information in newly built SCD files and reconstructed and expanded SCD files; the business layer is used to extract information based on device information and The virtual circuit connection information determines the upgrade device and affected device of the smart substation.
[0035] In the specific implementation, in the actual work of the sm...
Embodiment 2
[0062] On the basis of the above-mentioned embodiments, the embodiment of the present invention also provides an intelligent delineation method, which is applied to the above-mentioned intelligent delineation system, and is used to delineate the upgrading device and the affected device for the reconstruction and expansion of the smart substation, such as Figure 4 Shown is a flow chart of an intelligent delineation method, the method comprising the following steps:
[0063] Step S402, the presentation layer imports the new SCD file and the reconstructed and expanded SCD file of the smart substation;
[0064] Step S404, the persistent layer extracts the device information and virtual circuit connection information in the newly created SCD file and the rebuilt and expanded SCD file;
[0065] In step S406, the service layer determines the upgrade device and affected device of the smart substation according to the device information and the virtual circuit connection information. ...