Prefabricated concrete double-T type plate suspension structure and construction method thereof

A prefabricated concrete and hanging technology, which is applied to the processing of building components, building structures, and building materials, can solve problems such as the narrow use range of the bearing capacity of the horizontal roof, no direct stress on rib beams, and punching and shear damage. Achieve the effect of solving the problem of hanging load, convenient construction and large bearing capacity

Active Publication Date: 2019-09-06
CHINA AVIATION PLANNING & DESIGN INST GRP
View PDF8 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0008] The object of the present invention is to provide a hanging structure of prefabricated concrete double T-slabs and its construction method, to solve the problems of inconvenient roof welding operation, inability to supplement hanging points, and force transmission in the hanging structure at the cantilever end of the existing hanging structure. Concentrate on the technical problem that the use range of the bearing capacity of the horizontal roof is narrow; and solve the technical problem that the rib beams in the slab-rib hanging structure in the existing hanging structure are not directly stressed, and are prone to punching and shearing damage

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated concrete double-T type plate suspension structure and construction method thereof
  • Prefabricated concrete double-T type plate suspension structure and construction method thereof
  • Prefabricated concrete double-T type plate suspension structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0062] Embodiment one sees Figure 1-4 As shown, a prefabricated concrete double T-slab hanging structure includes double T-slabs, the double T-slabs include an upper horizontal roof 1 and a lower vertical two rib beams 2, the roof 1 and two rib beams 2 Forming a π shape, the end of the top plate 1 protruding relative to the rib beam 2 is a cantilevered end, and also includes a hanging structure at the cantilevered end.

[0063] The cantilevered end hanging structure is located at the cantilevered end seam of two adjacent double T plates, and the cantilevered end hanging structure includes the cantilevered ends 3 of the double T plates on both sides, the connecting structure 4, the additional Horizontal tie structure 5, hanging bars 6, hanging parts 7 and joint sealing material 8.

[0064] The connecting structure 4 is arranged symmetrically in pairs on both sides of the cantilevered end seam, and is respectively pre-embedded on the upper side surfaces of the cantilevered end...

Embodiment 2

[0080] Embodiment two see Figure 5-8 As shown, a prefabricated concrete double T-slab hanging structure includes double T-slabs, the double T-slabs include an upper horizontal roof 1 and a lower vertical two rib beams 2, the roof 1 and two rib beams 2 Forming a π shape, the end of the top plate 1 protruding relative to the rib beam 2 is a cantilevered end, and also includes a hanging structure at the cantilevered end.

[0081] The hanging structure at the cantilevered end is located at the joint of the cantilevered ends of two adjacent double T-plates, and a cast-in-place reinforced concrete laminated layer is poured on the upper side of the roof, and the cast-in-place reinforced concrete laminated layer includes a laminated Layers of steel mesh 12 and laminated layers of concrete 13.

[0082] The cantilevered end hanging structure includes cantilevered ends of double T-plates on both sides, a cast-in-place reinforced concrete composite layer, hanging bars 6 , first hanging ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a prefabricated concrete double-T type plate suspension structure and a construction method thereof. The prefabricated concrete double-T type plate suspension structure comprises a double-T type plate, and further comprises a cantilever end suspension structure and a plate rib suspension structure, the cantilever end suspension structure comprises cantilever ends of the double-T type plate on both sides, a connecting structure, an additional horizontal tie structure, a hanging rib, a hanging part and a joint sealing material, and the plate rib suspension structure comprises rib beams, top plates on both sides of the rib beams, a rib-penetrating steel sleeve, an upper inverted-U-shaped snap ring and a lower U-shaped snap ring. Or a laminated concrete layer is arrangedon the upper side of the double-T type plate, and the hanging rib is fixedly connected with a laminated bar-mat reinforcement. The prefabricated concrete double-T type plate suspension structure andthe construction method thereof are convenient to construct and are suitable for two situations of pre-burying before plate construction and later additionally-arranging after plate construction, a hanging node can be used for hanging of a suspended ceiling, an air duct, a lamp and other pipelines, and the prefabricated concrete double-T type plate suspension structure and the construction methodthereof are suitable for floor structures or roof structures and can further be used for connection of other prefabricated beam-plate members.

Description

technical field [0001] The invention relates to the field of hanging prefabricated component structures, in particular to a hanging structure of a prefabricated concrete double T plate and a construction method thereof. Background technique [0002] Prestressed concrete double T-slab is a prefabricated load-bearing member with beam and slab integrated. It uses high-strength steel wire or steel strand and high-performance concrete to optimize the design of beam height and slab thickness. To the simple and beautiful components. In order to achieve the purpose of cost-effectiveness, the double T-slabs are respectively the horizontal roof and the vertical rib beam. The thickness of the roof is very thin, and the height commonly used in China is 40mm-50mm at present. The cantilever length of the end of the horizontal roof relative to the rib beam is 490mm-740mm. [0003] In modern architectural design, there are often situations where air ducts or suspended ceilings need to be ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E04B1/38E04C2/04E04C2/38E04G21/00
CPCE04B1/38E04C2/04E04C2/38E04G21/00
Inventor 张庆亮王诚付桂宏贾洁
Owner CHINA AVIATION PLANNING & DESIGN INST GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products