Unified scheduling method of hardware resources in control system
A hardware resource and control system technology, applied in the general control system, control/regulation system, program control, etc., can solve the problems of too much attention to the management of hardware resources, the inability to realize communication information filtering, inconvenient maintenance and upgrade, etc., to achieve Ease of porting, isolation of differences, isolation of coupled effects
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] A specific embodiment of the present invention discloses a unified scheduling method for hardware resources in a control system, such as figure 1 shown, including the following steps:
[0049] S1. Establish a communication link between the business logic layer and the hardware resource management layer in the control system, and store all topic subscription information initiated by the business logic layer;
[0050] S2. The hardware resource management layer waits in a loop to receive the message sent by the business logic layer. After receiving the message, it analyzes the content of the message, determines the control type, and performs corresponding communication, AD or IO operations according to the control type. ;
[0051] S3. The hardware resource management layer waits in a loop to receive the data generated by the hardware resource port. When the data is received, data matching is performed according to the stored topic subscription information according to the...
Embodiment 2
[0056] To improve on the basis of Example 1, the step S1 further includes the following steps:
[0057] S11. Establish a business logic layer and a hardware resource management layer in the control system;
[0058] S12. The hardware resource management layer receives the registration application initiated by the business logic layer, and establishes a Socket communication link with the business logic layer; specifically, after the resource management layer receives the registration application, it obtains the information in the registration application Store the name of the device where the business logic layer is located and the local Socket, and establish a Socket communication link between the business logic layer and the resource management layer;
[0059] S13. Through the Socket communication link, the hardware resource management layer receives and stores all topic subscription information initiated by the business logic layer.
[0060] Preferably, step S1 further inclu...