Grouting reinforcement method of dam foundation rock mass

A technology for grouting reinforcement and rock mass, which is applied in the repair of basic structures, basic structure engineering, construction, etc., can solve problems such as increased engineering volume, troublesome procedures, inconvenient vibration, etc., to strengthen integrity and improve stability. Effect

Pending Publication Date: 2019-09-17
SHAZHOU PROFESSIONAL INST OF TECH +2
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] (1) Excavating broken rock mass, this method is the most reliable, and can be used for small-scale areas, but for large-scale dam foundation sites, this method will undoubtedly greatly increase the amount of work, and is not economically feasible;
[0005] (2) Use cast-in-situ piles to improve the bearing capacity of the bedrock. This method requires less investment, but since it is necessary to bind steel bars on site, then pour concrete, and vibrate and maintain after pouring concrete, the process is cumbersome, and the underground The pile body adopts the cast-in-place construction method, which is inconvenient to vibrate, and it is difficult to ensure the construction quality of the pile body

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] A grouting reinforcement method for a dam foundation rock mass, comprising the following steps:

[0024] Prefabrication of hollow piles, hollow piles are prefabricated in the factory, the hollow piles are concrete structures, prefabricated, and the structure is firm, reducing the construction period at the rock mass site of the dam foundation, through holes are concentrically arranged in the hollow piles, and outside the hollow piles The grout holes are arranged at intervals along the height direction on the circle, and the grout holes are respectively connected with the through holes, so as to facilitate the high-pressure overflow of grouting and expansive concrete;

[0025] For the production of steel cages, according to the structure of the hollow piles, the cylindrical steel cages are manufactured in the factory, and the embedded holes with a diameter not smaller than the outer diameter of the hollow piles are formed in the steel cages. In principle, the steel cages ...

Embodiment 2

[0030] A grouting reinforcement method for a dam foundation rock mass, comprising the following steps:

[0031] Prefabrication of hollow piles, hollow piles are prefabricated in the factory, the hollow piles are concrete structures, prefabricated, and the structure is firm, reducing the construction period at the rock mass site of the dam foundation, through holes are concentrically arranged in the hollow piles, and outside the hollow piles The grout holes are arranged at intervals along the height direction on the circle, and the grout holes are respectively connected with the through holes, so as to facilitate the high-pressure overflow of grouting and expansive concrete;

[0032] For the production of reinforcement cages, according to the structure of the hollow pile, a cylindrical reinforcement cage is manufactured on the construction site to adapt to the actual size of the pile hole, and an embedded hole with a diameter not smaller than the outer diameter of the hollow pil...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a grouting reinforcement method of a dam foundation rock mass. The grouting reinforcement method of the dam foundation rock mass comprises the following steps that a hollow pile is prefabricated, specifically, the hollow pile is prefabricated in a factory, a through hole is concentrically formed in the hollow pile, and grout outlet holes are formed in the outer circle of the hollow pile at intervals in the height direction; a reinforcing cage is fabricated, specifically, the cylindrical reinforcing cage is fabricated in the factory or a construction site; drilling is carried out, specifically, the drilling is carried out at a dam foundation to obtain a pile hole; assembling is carried out, specifically, the reinforcing cage is lifted into the pile hole; and grouting is carried out, specifically, high-pressure expanded concrete is poured inward through the through hole of the hollow pile, so that the expanded concrete overflows from the grout outlet holes, and part of the expanded concrete penetrates into gaps of the inner wall of the pile hole. According to the grouting reinforcement method of the dam foundation rock mass, the prefabricated hollow pile is specially designed, and through the cooperation of the hollow pile and the reinforcing cage, a composite pile body is obtained by utilizing the cast-in-situ expanded concrete, and thus the integrity of the composite pile body and the dam foundation rock mass is strengthened.

Description

technical field [0001] The invention relates to the technical field of geotechnical engineering, in particular to a grouting reinforcement method for dam foundation rock mass. Background technique [0002] Concrete high dams (such as gravity dams, arch dams, etc.) are built directly on the rock foundation, and the rock-soil mass of the dam foundation is prone to vertical and horizontal displacements under the action of the dam body's own weight and various load combinations. If the dam foundation is a rock mass with a weak or fractured structure, the rock mass of the dam foundation will often sink vertically due to the compression of pores or cracks in the rock mass. Once subsidence occurs, the stress conditions of the dam body will change, resulting in The dam body is partially unstable or even completely destroyed, so the integrity of the dam foundation is crucial to the safety of the dam body. [0003] When the dam foundation rock mass fails to meet the bearing capacity ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D37/00E02D27/40E02D15/04E02D27/12
CPCE02D15/04E02D27/12E02D27/40E02D37/00
Inventor 陈在铁王威任青文
Owner SHAZHOU PROFESSIONAL INST OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products