A temporary plugging method and temporary plugging agent for tripping string construction in water injection wells
A technology for water injection wells and temporary plugging agents, which is used in earth-moving drilling, wellbore/well components, sealing/packaging, etc. It can solve problems such as high cost, slow construction progress, and inability to completely solve on-site problems, and reduce wellheads. The effect of overflow and reducing wellhead pressure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] The present invention will be further described in detail below with reference to specific embodiments, which are to explain rather than limit the present invention.
[0026] The present invention is a temporary plugging method used for the construction of pipe strings in water injection wells. After mixing the temporary plugging agent, water and suspending agent in a liquid dosing tank on the ground, the injection rate of 1-2 cubic meters per hour is carried out by a metering pump truck. The mixed liquid is injected into the perforation section of the water injection well, and then the well is shut in for a while, and the perforation section is blocked after the plugging agent is cross-linked. After 5 hours, open the wellhead of the water injection well and watch the wellhead overflow. If the wellhead pressure drops rapidly, and if the pressure is less than 1MPa within 0.5 hours, it is judged that the perforation section is effectively blocked.
[0027] The mass ratio ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 