Warehousing resource allocation method and device and computer system
A technology of resource allocation and storage order, which is applied in the field of computer systems, can solve the problems of low utilization rate of warehouse resources and large randomness of allocation results, and achieve the effect of overall planning and sorting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0059] First of all, this embodiment 1 provides a storage resource allocation system from a macro point of view, such as figure 1 As shown, the system can include:
[0060] The second client is used to submit a request for creating an overall planning cycle;
[0061] The server is configured to determine an overall planning period according to the second client, and provide information related to the overall planning period to multiple first user clients;
[0062] The first user client is used to submit to the server a replenishment plan that needs to be replenished within the overall planning week within the specified registration time, and the replenishment plan includes the items reserved by the first user. Regarding the reserved storage capacity and reserved storage date information of commodity storage, the scheduled storage date is within the date range of the overall planning cycle;
[0063] The server is further configured to, according to the reserved storage capaci...
Embodiment 2
[0067] see figure 2 , which is a flow chart of the storage resource allocation method provided by the embodiment of the present application, specifically including:
[0068] S201. Determine the planning cycle;
[0069]In a specific implementation, the execution subject of each step in the first embodiment may be a server, and the server may also have the functions of the aforementioned first server and the second server, and so on. Among them, specific planning cycles can be created through the application of platform staff (commonly known as "secondary"). For example, before the start of a large-scale promotional activity, the "secondary" can select a period of time as the overall planning period based on information such as the start time of the activity. This period of time is usually a period of time before and after the start of the activity. There will be a large number of first users who all have a need to replenish the warehouse. After determining the specific over...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com