Midline type tailing dam
A technology for tailings dams and tailings accumulation dams, applied in filling and other directions, can solve problems such as failure to realize and the advantages of the mid-line tailings dam building method have not been fully reflected, etc., to improve intrinsic safety, reduce wetting lines, improve The effect of stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0025] Embodiments of the present invention are described in detail below, examples of which are shown in the drawings, wherein the same or similar reference numerals designate the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the figures are exemplary only for explaining the present invention and should not be construed as limiting the present invention.
[0026] Refer below figure 1 Describe the centerline tailings dam 100 according to the embodiment of the present invention. It should be noted that the centerline tailings dam 100 is a tailings dam 100 constructed by the centerline tailings damming method, and the centerline tailings damming method is in The dam construction method of separating coarse tailings by hydrocyclone at the axis of the initial dam 1, specifically, the centerline tailings dam 100 includes the initial dam 1 and the tailings accumulation dam arranged on the top of ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com