Temporary plugging and acidization method for multiple seams among sections of horizontal wells
A horizontal well section and horizontal well technology, which is applied in the field of repeated stimulation of old oilfields, can solve the problems of poor stimulation effect and insufficient repeated stimulation of horizontal wells, and achieve the effect of restoring production capacity.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0025] In order to overcome the problem that the acid liquid preferentially enters the high-permeability zone in the existing method, and the low-permeability zone basically does not enter the acid, so the repeated reconstruction of the horizontal well is insufficient and the reconstruction effect is not good. The present invention provides a multi-fracture temporary plugging between horizontal well sections. In the acidizing method, the present invention injects oil-displacement fracturing fluid into horizontal wells that have been produced for a period of time to supplement formation energy; for horizontal wells, acidizing in stages, the target formation is more obvious, and the acid liquid enters the formation and the affected area is larger; through temporary plugging Acidizing, blocking the high permeability zone, focusing on acidizing the low permeability zone, dredging the low permeability zone, can improve the oil flow channel of the remaining oil, and realize the produc...
Embodiment 2
[0039] On the basis of Example 1, in this example, preferably, in step 1) when selecting target wells for acidification that require staged temporary plugging in horizontal wells, select horizontal wells that exhibit the characteristics of low production due to formation plugging.
[0040] Preferably, in step 2), if the shut-in pressure measurement period is greater than 20 days, the pressure measurement results of the surrounding wells in the past three years can be used as a reference for the pressure measurement of the well, so that the pressure measurement of the well is no longer performed.
[0041] Preferably, in the step 6), the injection method of the temporary plugging agent suspension is determined according to the squeeze pressure. If the squeeze pressure is less than 9MPa, first pour 600kg of the temporary plugging agent into the water to prepare a mass concentration of 15%. Inject the temporary blocking agent suspension; when the pressure of the temporary blocking ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com