Skin construction method of steel-structured inter-cooling tower
A construction method and steel structure technology, applied to towers, building types, buildings, etc., can solve the problems of inability to realize full-cycle maintenance of the skin system and slow installation of hoisting units, so as to achieve full-cycle maintenance, improve construction speed and Mounting accuracy and the effect of improving sealing performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] In order to make the purpose, advantages and features of the present invention clearer, the skin construction method of a steel structure inter-cooling tower proposed by the present invention will be further described in detail below in conjunction with the accompanying drawings. It should be noted that all the drawings are in a very simplified form and use imprecise scales, and are only used to facilitate and clearly assist the purpose of illustrating the embodiments of the present invention.
[0040] The invention provides a skin construction method of a steel structure intercooling tower, the method is as follows figure 1 shown, including the following steps:
[0041] S101: Assemble the steel members and purlins into the first unit plate.
[0042] For example, if figure 2 As shown, a stable triangular configuration is formed with one horizontal member 1 and two oblique members 2; then, as image 3 As shown, the purlin 3 is installed on the triangular configuratio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


