Installation method and manufacturing process of a suspended aluminum veneer
An installation method, the technology of aluminum veneer, applied in the direction of building structure, walls, buildings, etc., can solve the problems of poor safety, easy falling of the sound insulation layer, poor connection stability, etc., and achieve high installation stability, strong safety, Highly stable effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048] A suspended aluminum veneer installation structure, such as figure 1 and figure 2 As shown, it includes a keel frame 1 fixed on the surface of the outer wall and an aluminum plate 2 relatively fixed to the keel frame 1. A plurality of horizontal screw rods 111 are fixedly arranged on the keel frame 1, and a screw rod 111 opposite to the screw rod 111 is provided on the aluminum plate 2. Mounting hole 22, the screw rod 111 passes through the mounting hole 22 and is tightened with a nut 112, so that the aluminum plate 2 can be stably suspended on the screw rod 111, and the side of the aluminum plate 2 facing away from the surface of the outer wall is provided with a mounting groove 21, and a mounting groove 21 is inserted in the mounting groove 21. The matching sound insulation board 3 is to improve the sound insulation effect, and the notch position of the installation groove 21 is covered with a positioning cover 4, and the positioning cover 4 and the aluminum plate 2 ...
Embodiment 2
[0058] A method for installing a suspended aluminum veneer, comprising the following steps:
[0059] S1. Manufacture and install the keel frame 1, and weld and fix multiple horizontal screw rods 111 on multiple longitudinal supports 11 in advance;
[0060] S2, install the aluminum plate 2, insert the screw rod 111 into the installation hole 22 and tighten the nut 112, so that the nut 112 is located inside the counterbore 221;
[0061] S3. Install the sound insulation board 3, insert the sound insulation board 3 into the installation groove 21, insert the screw rod 111 into the socket 32 during installation, and insert the clip 242 into the slot 31 to fix the sound insulation board 3;
[0062] S4, cover the positioning cover 4, and cover the positioning cover 4 at the position of the notch of the installation groove 21, and the clamping part 23 and the buckling part 41 are clamped and matched during installation;
[0063] S5, the gap between two adjacent aluminum plates 2 is...
Embodiment 3
[0065] A manufacturing process of a suspended aluminum veneer, comprising the following steps:
[0066] a) Open a mounting groove 21 on one side of the aluminum plate 2;
[0067] b) Drill out the mounting holes 22 at the four corners of the groove bottom of the mounting groove 21, and mill out the counterbore 221 on the side of the mounting hole 22 facing the mounting groove 21;
[0068] c) Drill out the chute 24 at the relative position of the groove bottom of the mounting groove 21, drill the unlocking groove 25 at the relative position of the notch of the mounting groove 21, and make the unlocking groove 25 communicate with the chute 24;
[0069] d) Manufacture clip 242, mill one end of clip 242 out of the arc surface, weld clamping spring 241 at the end of clip 242 away from the arc surface, extend clip spring 241 in the chute 24, and utilize welding The device extends from the locking groove to weld the clamping spring 241 to the groove bottom of the chute 24;
[0070] ...
PUM