Method for managing link connection between nodes and related equipment
A link connection and node technology, applied in the field of link connection management between nodes, can solve the problems of RNL layer signaling and interface service interruption, and achieve the effect of improving utilization, reducing reconstruction and interface service interruption.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] Figure 6 It is a schematic flowchart of the method for link connection management between nodes provided by Embodiment 1 of the present invention. Such as Figure 6 As shown, the method includes:
[0044] In step 601, the first mobile node establishes a Setup procedure through a network interface, and establishes link connections with multiple peer network nodes respectively.
[0045] Wherein, the link connection includes at least one of the following: a control plane signaling connection and a user plane data connection.
[0046] Specifically, the link connection may further include a control plane signaling connection (for transmitting control signaling messages, etc.) and a user plane data connection (for transmitting service data packets, etc.).
[0047] Wherein, the first mobile node respectively establishes link connections with a plurality of peer network nodes through the setup process of the network interface, including:
[0048] The first mobile node divi...
Embodiment 2
[0082] Figure 7a A schematic diagram of multi-connection of NG interfaces between network nodes provided by Embodiment 2 of the present invention; Figure 7b A schematic diagram of multi-connection of the F1 interface between network nodes provided by Embodiment 2 of the present invention; Figure 7c It is a schematic diagram of multi-connection on the Xn interface between network nodes provided by Embodiment 2 of the present invention.
[0083] Such as Figure 7a As shown, there is a single NG-RAN base station 1 (mobile node) on the left, which can be physically mobile, so the TNL transmission bearer between it and other network element nodes and the upper layer RNL NGAP connection are prone to change or be interrupted destroy. On the right side, there are multiple sets of 5GC peer network element nodes. They are fixed or stationary on the ground by default. They are the peer objects that each mobile NG-RAN base station needs to establish TNL transmission bearer and upper...
Embodiment 3
[0117] In the third embodiment, the local cell set includes only one cell, that is, one cell is a local cell set; the first mobile node is a mobile NG-RAN base station, and the mobile NG-RAN base station is a full gNB function LEO low earth orbit satellite; the peer network node is an access mobile function node AMF; the link connection between the first mobile node and the peer network node is an NG interface connection.
[0118] Figure 8a A schematic diagram of the structure of the FU-type satellite communication system provided by Embodiment 3 of the present invention, as shown in Figure 8a As shown, in the FU-type satellite communication system, multiple LEO low-earth orbit satellites are loaded with the Full gNB function, and they run around the earth along a specific same orbit in space. A terminal UE on the ground (assuming it is quasi-stationary on the ground and in the RRC connection state) is currently in the ground planning coverage area 1 under the jurisdiction ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



