Tunnel full-section building method adopting advanced pre-reinforcement, primary lining and secondary lining
A construction method and advanced reinforcement technology, applied in tunnels, tunnel linings, shaft linings, etc., can solve problems such as tunnel diseases, low construction efficiency, and increased loose area of surrounding rocks, and achieve green construction, improve construction efficiency, and improve modernization horizontal effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0029] Figure 1-Figure 5 respectively Image 6 with Figure 7 The cross-sectional structure diagram of A-A, B-B, C-C, D-D, E-E, Image 6 with Figure 7 respectively Figure 1-Figure 5 The cross-sectional structure diagrams of 1-1 and 2-2. When the surrounding rock conditions are poor, the advance pre-reinforcement of the tunnel will require grouting, horizontal jet spraying and other construction methods for reinforcement; when the surrounding rock conditions are good, no inverted arch-related construction will be required, which will be considered according to the actual engineering situation.
[0030] Using this construction method, it is necessary to be equipped with bolter drilling rigs, intelligent assembly of initial support and intelligent grouting trolley behind the wall, intelligent assembly of the second lining and intelligent grouting trolley behind the wall, so as to realize rapid mechanized and intelligent construction of the full section of the tunnel and im...