Upper step base plate minimally invasive blasting structure and minimally invasive blasting excavation method for maintaining tunnel step stability
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- 中铁二局第二工程有限公司
- Publication Date
- 2019-12-24
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field related to tunnel construction, in particular, to a minimally invasive blasting structure for an upper-step bottom plate and a minimally invasive blasting excavation method for maintaining the stability of tunnel steps. Background technique
[0002] The most commonly used construction method of tunnel drilling and blasting is the upper and lower step method (applicable to III, IV and V surrounding rocks), which is further refined into micro-step method according to the different step lengths (the upper step length is 3-5m, suitable for III, IV , Grade V surrounding rock), short-step method (the length of the upper step is 10-15m or B-1.5B, B is the tunnel excavation width, applicable to Grades III, IV, and V surrounding rock) and long-step method (the length of the upper step ≥ 5B, generally used in level III, is not commonly used now). Theoretically speaking, compared with the short-step method and long-st...