[0029] Embodiment 1 A construction method for floor leveling and anti-cracking, comprising the following steps:
[0030] (1) Base treatment: remove the floating soil and mortar on the surface of the base;
[0031] (2) Find the elevation: according to the horizontal standard line and the design thickness, draw the height control line on the surrounding walls and columns, and the height control line is 5cm away from the base;
[0032] (3) Lay plastic strips: install plastic strips in the area to be constructed, the distance between adjacent plastic strips is 1m, the thickness of plastic strips is 10mm, and the top of plastic strips is flush with the height control line;
[0033] (4) Laying cement slurry: wet the base, and brush a layer of plain cement slurry on the base, and lay the well-mixed cement mortar between adjacent plastic strips. The amount of cement mortar should be slightly higher than the top of the plastic strips. appropriate;
[0034] (5) Vibration: Vibrate with...
Embodiment 2
[0036] Embodiment 2 A leveling and anti-cracking construction method for a floor, comprising the following steps:
[0037] (1) Base treatment: remove the floating soil or mortar on the surface of the base;
[0038] (2) Find the elevation: according to the horizontal standard line and the design thickness, draw the height control line on the surrounding walls and columns, and the height control line is 4cm away from the base;
[0039] (3) Lay plastic strips: Install plastic strips in the area that needs to be constructed, the distance between adjacent plastic strips is 1.5m, the thickness of plastic strips is 15mm, and the top of plastic strips is flush with the height control line;
[0040] (4) Laying cement slurry: wet the base, and brush a layer of plain cement slurry on the base, and lay the well-mixed cement mortar between adjacent plastic strips. The amount of cement mortar should be slightly higher than the top of the plastic strips. appropriate;
[0041] (5) Vibration...
Embodiment 3
[0046] Embodiment 3 A leveling and anti-cracking construction method for a floor, comprising the following steps:
[0047] (1) Base treatment: remove the floating soil or mortar on the surface of the base;
[0048] (2) Find the elevation: according to the horizontal standard line and the design thickness, draw the height control line on the surrounding walls and columns, and the height control line is 4cm away from the base;
[0049] (3) Lay plastic strips: Install plastic strips in the area that needs to be constructed. The distance between adjacent plastic strips is 2m, and the thickness of plastic strips is 15mm. both are even;
[0050] (4) Laying cement slurry: wet the base, and brush a layer of plain cement slurry on the base, and lay the well-mixed cement mortar between adjacent plastic strips. The amount of cement mortar should be slightly higher than the top of the plastic strips. appropriate;
[0051] (5) Vibration: Vibrate with a vibrator to ensure that the concre...