Workover Operation Method for Low Permeability and Water Sensitive Oil Wells
A technology for oil wells and workovers, which is applied in wellbore/well components, earthwork drilling, drilling equipment, etc., and can solve problems such as the long shutdown time of midway shutdown and the inability to shut down wells in time due to oil spill at the wellhead
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The workover operation method of the low-permeability water-sensitive oil well of the present invention comprises the following steps in turn: (1) After hanging the elevator one with the sucker rod hook, hang the upper part of the polished rod with the elevator one, and put the oil production three on the wellhead Christmas tree (2) Lift up the polished rod until the upper end of the first sucker rod exposes the oil production tee, and then use the second elevator to clamp it under the upsetting flange of the first sucker rod, and the hook of the sucker rod Use the second elevator on the oil production tee for the downward movement; ⑶ remove the polished rod, move the polished rod to level, then the hook of the sucker rod is separated from the first elevator, and remove the first elevator from the polished rod; ⑷ use the sucker rod After hanging Elevator 2 on the hook, lift up the hook of the sucker rod until the upper end of the second sucker rod exposes the oil product...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 