Construction method of water bladder pebble mixed soil layer earth pressure shield tunnel crossing river channel

A construction method and river channel technology, applied in earthwork drilling, tunnel, tunnel lining, etc., can solve problems such as rare cases of crossing rivers, large construction risks and technical difficulties

Active Publication Date: 2021-08-10
CHINA RAILWAY 12TH BUREAU GRP +1
View PDF8 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The technology of earth pressure shield crossing small rivers with water-resistant layers in cities is becoming more and more mature, but the cases of crossing rivers in the stratum with rich water-rich pebble mixed soil and local "water pockets" are relatively rare, and there are relatively large construction risks and technical problems. difficulty

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of water bladder pebble mixed soil layer earth pressure shield tunnel crossing river channel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment approach

[0024] According to an embodiment of the present invention, preferably, the step S2) further includes: adding grease to the shield tail, hinged position and main bearing position of the earth pressure shield machine to enhance the sealing of the earth pressure shield machine The characteristics make the earth pressure shield machine have the construction conditions, and can continue to carry out the shield construction after eliminating potential safety hazards, which improves the construction efficiency.

[0025] According to the technical solution of the present invention, step S3) injects double liquid slurry behind the spacer segment wall within the predetermined range from the shield tail of the earth pressure shield machine to form a water stop ring, preventing the earth pressure shield from When the machine is shut down, groundwater seeps into the excavated tunnel space to ensure the safety of the earth pressure shield machine.

[0026] According to an embodiment of the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a construction method for crossing a river channel with an earth pressure shield machine in a mixed soil layer of water capsule pebbles, comprising the following steps: S1) in the process of using an earth pressure shield machine to cross the soil layer below the river channel during the construction stage of the tunnel concealed excavation, In the case of continuous gushing at the position of the screw machine of the earth pressure shield machine, the construction of the earth pressure shield machine is suspended; S2) Inject bentonite into the shield tail and the soil bin of the earth pressure shield machine, and then rotate the cutter head according to the predetermined interval To avoid locking of the earth pressure shield machine; S3) inject double liquid slurry behind the spacer segment wall within the predetermined range from the shield tail of the earth pressure shield machine to form a water stop ring; S4) divert the river channel, Make the new river channel after the diversion a predetermined distance from the shield tail of the earth pressure shield machine; S5) set up multiple precipitation wells at intervals along the two sides of the original river channel position, and complete the precipitation operation; S6) adjust the soil bin of the earth pressure shield machine Pressure to restore the earth pressure shield machine construction, continue to excavate through the soil layer below the original river channel with the predetermined pressure of the soil bin.

Description

technical field [0001] The invention relates to the technical field of shallow-buried underground excavation tunnels, in particular to a construction method for crossing a river channel by an earth-pressure shield tunneling in water capsule pebble mixed soil layer. Background technique [0002] The technology of earth pressure shield crossing small rivers with water-resistant layers in cities is becoming more and more mature, but the cases of crossing rivers in the stratum with rich water-rich pebble mixed soil and local "water pockets" are relatively rare, and there are relatively large construction risks and technical problems. difficulty. Contents of the invention [0003] The present invention provides a construction method for earth pressure shield tunneling in a water capsule pebble mixed soil layer and crossing a river, which avoids filling holes with open water during the construction process of the earth pressure shield machine, prevents river bottom subsidence, a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/08E21D11/38E21D11/08
CPCE21D9/08E21D11/08E21D11/38E21D9/0642E21D9/0678
Inventor 王俊杰李自力武鑫星郭兰荣崔军华姚八五
Owner CHINA RAILWAY 12TH BUREAU GRP