Construction method of water bladder pebble mixed soil layer earth pressure shield tunnel crossing river channel
A construction method and river channel technology, applied in earthwork drilling, tunnel, tunnel lining, etc., can solve problems such as rare cases of crossing rivers, large construction risks and technical difficulties
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0024] According to an embodiment of the present invention, preferably, the step S2) further includes: adding grease to the shield tail, hinged position and main bearing position of the earth pressure shield machine to enhance the sealing of the earth pressure shield machine The characteristics make the earth pressure shield machine have the construction conditions, and can continue to carry out the shield construction after eliminating potential safety hazards, which improves the construction efficiency.
[0025] According to the technical solution of the present invention, step S3) injects double liquid slurry behind the spacer segment wall within the predetermined range from the shield tail of the earth pressure shield machine to form a water stop ring, preventing the earth pressure shield from When the machine is shut down, groundwater seeps into the excavated tunnel space to ensure the safety of the earth pressure shield machine.
[0026] According to an embodiment of the...