Unlock instant, AI-driven research and patent intelligence for your innovation.

Building pile foundation construction method

A construction method and technology of building piles, applied in the direction of construction, foundation structure engineering, sheet pile walls, etc., can solve the problems of being unable to move, increasing construction costs, muddy, etc., and achieve the effect of reducing the degree of muddyness and facilitating movement

Inactive Publication Date: 2020-01-31
深圳稳健建设集团有限公司
View PDF3 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] With the development of civil engineering technology, more and more pile foundations are used in engineering construction. The commonly used method in pile foundation drilling construction is the percussion drilling rig drilling construction method. When using percussion drilling rigs for construction, mud protection is required. Drilling, and in order to better improve the quality of the post-pile foundation construction after the drilling, it is necessary to use double drill bits to clear the hole and other methods to clean up the dregs at the bottom of the hole, but in the construction of the mud retaining wall, the thickness of the dregs at the bottom of the hole Even after clearing the hole, there will often be the problem that the thickness of the ballast exceeds the standard; and during the construction process, when the mud retaining wall is used for construction, the construction site will be muddy, which will cause the problem of inconvenient movement of the drilling rig. During the process, the soil layer will continue to be disturbed, so that the surface of the soil layer will be further stirred into mud, making the movement of the drilling rig more inconvenient or even impossible to move. At this time, it can only be solved by stopping work or using the method of laying steel plates. Increased construction cost; the existing pile foundation construction method has the problem that the thickness of the bottom of the hole exceeds the standard and the drilling rig is prone to inconvenient movement after the mud wall is used

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0031] Embodiment: a kind of building pile foundation construction method, comprises the following steps:

[0032] (1) Site preparation before construction: Before construction, it is necessary to level and compact the construction site as a whole, so that the ground of the construction site can meet the requirements of the drilling rig's bearing capacity; measure and mark the positions of pile holes in the site, and then A mud pool is dug between the pile holes, and a number of drainage grooves are dug around the pile holes. The drainage groove and the mud pool are connected to each other; metal sheets are laid on the bottom and both sides of the drainage groove to prevent water from infiltrating when the mud flows in the drainage groove In the middle of the soil layer, set up a steel plate above the drainage tank to prevent the drilling rig from damaging the drainage tank when moving; when the mud protection wall is used, the mud flowing out of the hole can flow into the mud ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building pile foundation construction method, relates to the field of building foundation construction, and solves the problems that dregs in pile holes are not cleaned completely and a drilling rig is inconvenient to move due to muddy ground after adoption of mud protection wall operation in the prior art. The method in the technical scheme is characterized by comprisingthe following steps of (1), site preparation before construction; (2), burying of a pile casing; (3), grouting; (4), drilling; (5), hole cleaning; (6), hanging of a reinforcement cage; (7), concretepouring; and (8), pile forming. According to the method, the dregs at the bottoms of the holes are cleaned more sufficiently by adopting a pneumatic stirring mode, furthermore, mud splashed on the ground is guided, so that the muddy degree of the ground of the construction site is reduced, and the drilling rig is convenient to move.

Description

technical field [0001] The invention relates to the field of building foundation construction, more specifically, it relates to a method for building pile foundation construction. Background technique [0002] With the development of civil engineering technology, more and more pile foundations are used in engineering construction. The commonly used method in pile foundation drilling construction is the percussion drilling rig drilling construction method. When using percussion drilling rigs for construction, mud protection is required. Drilling, and in order to better improve the quality of the post-pile foundation construction after the drilling, it is necessary to use double drill bits to clear the hole and other methods to clean up the dregs at the bottom of the hole, but in the construction of the mud retaining wall, the thickness of the dregs at the bottom of the hole Even after clearing the hole, there will often be the problem that the thickness of the ballast exceeds...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D27/12E02D5/38
CPCE02D5/38E02D27/12
Inventor 陈阳明
Owner 深圳稳健建设集团有限公司