Reinforcing structure for jump of bridge abutment
A technology for strengthening structures and abutments, applied in underwater structures, infrastructure engineering, bridges, etc., can solve problems such as uneven settlement, and achieve the effect of weakening uneven settlement, not easy to break, and improving expansion joints
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0023] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0024] The invention discloses a reinforcement structure for prevention and control of abutment vehicle jumping, such as figure 1 and figure 2 As shown, a reinforcement structure for the prevention and control of abutment vehicle jumping comprises a bridge 1, an abutment 2, a roadbed 14, an abutment 2 and a roadbed 14, and the abutment back roadbed 3 is set between the abutment 2 and the roadbed 14. It is characterized in that: the abutment back The subgrade 3 is evenly distributed step by step upward in the direction away from the abutment 2. The steps 8 extend upward step by step and connect with the bottom of the road subgrade 14. Between the steps 8 and the abutment 2, there is a back filler Area 10, the back filling area 10 includes stones and sandy soil, and includes a geogrid 9 that divides the back filling area 10 into several layers and is arranged...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Density | aaaaa | aaaaa |
| Width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More 

