266results about How to "Meet engineering requirements" patented technology

Multi-functional multi-specimen sealing gasket service life evaluation testing apparatus

The invention relates to a multi-functional multi-specimen sealing gasket service life evaluation testing apparatus which comprises a gasket loading and load measuring system (56) and a medium given system (51). The apparatus is characterized in that the air given end of the medium given system (51) is connected with the air inlet end of a medium sealing system (53), the medium sealing system (53) is positioned inside of a temperature controlling and measuring system (54), a cooling thermal insulation system (57) is placed above the medium sealing system (53), and a leakage rate measuring system (55) is positioned on one side of the temperature controlling and measuring system (54); the medium sealing system (53), the temperature controlling and measuring system (54) and the cooling thermal insulation system (57) are connected respectively through stress bolts (14) of the gasket loading and load measuring system (56); and a data acquisition and control system (52) is respectively and electrically connected with the medium given system (51), the medium sealing system (53), the temperature controlling and measuring system (54), the leakage rate measuring system (55) and the cooling thermal insulation system (57).
Owner:NANJING TECH UNIV

Construction method for jointing of steel reinforcement cages of reinforced concrete drilling bored concrete pile

The invention relates to the field of drilling bored concrete pile construction, in particular to a construction method for jointing of steel reinforcement cages of a reinforced concrete drilling bored concrete pile. The construction method solves the problems of unwarranted joint quality, complicated jointing operation, time and energy waste, low construction speed and the like of conventional steel reinforcement cage jointing. The construction method comprises the following steps of: 1) performing rolling and straight thread processing on bar ends of the steel reinforcement cage; 2) manufacturing the steel reinforcement cage in a segmented way by using a steel reinforcement cage bar joint jointing precision control device; and 3) positioning the lower segment of the steel reinforcement cage in a hole, adjusting the levelness of a lower joint end face first, hoisting the upper segment of the steel reinforcement cage in place, adjusting the verticality, aligning all main bars of the upper and lower segments of the steel reinforcement cages in positions and pressing against the ends next, and screwing sleeves of the main bar ends of the upper segment of the steel reinforcement cage downwards on the main bar ends of the lower segment of the steel reinforcement cage at last to realize the jointing of the upper and lower steel reinforcement cages. The construction method guarantees the bar joint quality, has high steel reinforcement cage joint performance and high construction speed, reduces piling time, saves cost on machine team and the like and shortens the construction period.
Owner:CHINA RAILWAY SIXTH GRP CO LTD +1

Novel phosphorus and magnesium based cement grouting material and preparation method

The invention discloses a novel phosphorus and magnesium based cement grouting material and a preparation method and belongs to the field of technical application of grouting materials. The grouting material is prepared from the following raw materials in parts by weight: a component A: 30 to 90 parts of a compound magnesium compound, 0.5 to 5 parts of a compound retarder, 0.2 to 0.7 part of a water reducer, 0.2 to 1.5 parts of an acid-alkali buffering agent, 1 to 5 parts of a compound stabilizer and 0.5 to 1.5 parts of a compound surfactant; a component B: 20 to 50 parts of phosphate and 0.2to 2 parts of a de-foaming agent. The preparation method comprises the following steps: accurately weighing materials of the component A and the component B according to the ratio and uniformly stirring; mixing with water according to the weight ratio of 100 to (20 to 50) and stirring to form slurry; after uniformly mixing, pressing a mixture into gaps or cracks and curing. The novel phosphorus and magnesium based cement grouting material disclosed by the invention has the beneficial effects of controllable coagulation time, large adjustable range, high early age strength, high bonding strength, good permeability, simplicity and convenience for construction, greenness and environment protection and low cost, and meets the requirements on three properties including injectability, controllability and permeability resistance.
Owner:山东塔罗斯智能装备有限公司

Predicting method of aluminum alloy die pressed casting grain size based on GA-ELM algorithm

The invention discloses a predicting method of an aluminum alloy die pressed casting grain size based on a GA-ELM algorithm. The predicting method comprises the first step of using the new algorithm GA-ELM which combines a genetic algorithm GA and an extreme learning machine ELM; the second step of using the GA-ELM algorithm to predict the grain size with high efficiency, high precision and low cost; directly inputting a technological parameter which needs to be predicted into a trained GA-ELM model through a user, and obtaining a corresponding predicted value of the grain size after calculation. According to the predicting method of the aluminum alloy die pressed casting grain size, the GA-ELM model is the combination of the genetic algorithm and the extreme learning machine, the GA is adopted to conduct optimization on a weight matrix of an input layer and a threshold value matrix of a hidden layer of the ELM, the influence of randomness of the weight matrix of the input layer and the threshold value matrix of the hidden layer on the predicting accuracy of the ELM is avoided, the predicting accuracy and the predicting efficiency are improved, and the cost is sharply reduced; in addition, a model base of the predicting method of the aluminum alloy die pressed casting grain size can be enriched.
Owner:GUIZHOU UNIV

Dragline curtain wall support system with steel truss at top and construction method thereof

The invention provides a dragline curtain wall support system with a steel truss at the top and a construction method thereof. The dragline curtain wall support system comprises main building structures at two sides, a support structure at the lower part, the steel truss at the top and a curtain wall steel cable at the middle, wherein the main building structures provide left and right fixed points of the steel cable, and the steel truss and the support structure at the lower part provide upper and lower fixed points of the curtain wall steel cable; a two-direction fixed mode of horizontal connection and vertical connection is adopted at the two ends of the steel truss and between the main building structures; and the horizontal connection is realized through a horizontal bearing support, and the vertical connection is realized through a vertical bearing support. The dragline curtain wall support system is simple in structure and convenient in construction; by virtue of the two-direction support fixed mode, the structure strength is increased, the node structure is simplified, and the structure safety is greatly increased; The horizontal bearing support is installed after vertical steel cable prestress tension to enable the steel truss to freely rotate under the action of the vertical force, so that the secondary stress of buildings at two sides is reduced; and by transferring force by a horizontal steel plate, the bearing force is large, the stress is reliable, and micro-vertical deformation of the steel truss can also be applicable.
Owner:CHINA AVIATION PLANNING & DESIGN INST GRP

Slave end controller of interventional operation assisting system with catheter-guide wire conducting collaborative operation

ActiveCN105616008AMeet engineering requirementsMeet the requirements of bionicsSurgical robotsMotion controllerOperability
The invention discloses a slave end controller of an interventional operation assisting system with catheter-guide wire conducting collaborative operation and belongs to the technical field of medical equipment.The slave end controller comprises a guide wire, a guide wire operator, a catheter, a catheter operator, a sliding bracket, an axial movement controller and a shell; the guide wire operator is used for conducting rotating, clamping and relaxing operation on the guide wire used for the operation; the catheter operator is used for conducting rotating, clamping and relaxing operation on the catheter used for the operation; the sliding bracket is used for supporting the guide wire and the catheter and limiting the movement locus of the guide wire before entering the catheter so as to prevent the guide wire from being bent before entering the catheter; the axial movement controller is used for controlling axial movement of the catheter and the guide wire; the shell is used for supporting the guide wire operator, the catheter operator and the sliding bracket.According to the slave end controller, interventional actions are completed according to operation information of doctors, real-time haptical information can be fed back to the doctor visually, and safety and operability of the interventional operation can be improved.
Owner:SHENZHEN INST OF ADVANCED BIOMEDICAL ROBOT CO LTD

Three-dimensional reference line-based BIM creation method for building

The invention discloses a three-dimensional reference line-based BIM creation method for a building. The method comprises the following steps of S1, generating a spatial three-dimensional line based on planar and longitudinal section data of a line; S2, extracting the position of a building plane center, and generating a discontinuous three-dimensional building model according to a relationship between the position and the spatial three-dimensional line; S3, establishing a local coordinate system corresponding to a mileage point of the line, drawing a corresponding structure outline according to the local coordinate system, and performing sweeping and lofting on the structure outline based on the spatial three-dimensional line to generate a continuous three-dimensional building model; and S4, generating a complete BIM of the building. According to the method, the BIM of the building is created; three-dimensional visual design of building layout is realized; the generated model is visual and vivid, and the model is extremely convenient to update and modify, so that the engineering efficiency can be improved; and in addition, the generated model establishes a building full-life-cycle database, so that more bases are provided for later operation and maintenance.
Owner:GUANGZHOU METRO DESIGN & RES INST

Built-in anti-seepage geomembrane damage monitoring method based on optical fiber temperature-measurement principle

The invention relates to a rapid damage positioning scheme for an internal geomembrane in anti-seepage engineering, belonging to the technical field of hydraulic engineering (civil engineering)- anti-seepage engineering. The method comprises the following steps of: combining continuous optical fibers and the geomembrane into a whole, wherein the optical fibers are uniformly arranged in a snakelike shape on the geomembrane, and the distance between the optical fibers is not greater than the temperature-sensitive distance of double optical fibers; using the geomembrane as an anti-seepage material and making the optical fiber path of the whole anti-seepage area through; leading out the endpoints of the optical fibers to an optical fiber temperature-measurement detection device and covering aprotective layer of the geomembrane; and establishing a conversion formula between the XY coordinate values of optical fiber length L and an anti-seepage face according to the arrangement design of the anti-seepage engineering, monitoring the temperature of each position of the geomembrane by adopting the optical fiber temperature-measurement detection device, judging the area with abnormal temperature comparison to be a seeping position and judging the position with highest temperature abnormality to be the central position of the geomembrane damage. The method solves the problem of difficult damage positioning of the geomembrane and can obviously improve the safety of a dam using the geomembrane as an anti-seepage body.
Owner:KUNMING UNIV OF SCI & TECH

Vascular interventional operation robot main end force feedback device and working method thereof

A vascular interventional operation robot main end force feedback device is characterized by comprising a cylindrical magnetic conduction stick, an operation rod, a catheter, a connection buckle internally comprising a bearing, a solid optical-electricity encoder, a hollow optical-electricity encoder, a coil, a spool, a guide rail and a magnet; the working method includes the steps that when the rotating angle is measured, the rotating angle can be measured by rotating the catheter to drive an inner shaft of the hollow optical-electricity encoder to rotate; when axial movement information is ensured, a solid shaft of the solid optical-electricity encoder rotates together with an operation rod through the guide rail so that advancing displacement can be converted into the rotating angle; force feedback of the operation force of a slave operator is achieved on a master operator. The vascular interventional operation robot main end force feedback device has the advantages that the design lays emphasis on real-time feedback of the operation force of operations, the operation force of the slave operator can be directly fed back to the operation hand of a doctor in real time through an operation pipe on the main operator, feedback is visible, and requirements for operation safety and doctor operation are met; the axial information of operation of the doctor is efficiently obtained in an electromagnetic induction mode without adding additional loads.
Owner:SHENZHEN INST OF ADVANCED BIOMEDICAL ROBOT CO LTD

Semi-assembly type retaining wall of soil filling slope and construction method for semi-assembly type retaining wall

The invention relates to the technical field of retaining walls of soil filling slopes, and discloses a semi-assembly type retaining wall of a soil filling slope. The semi-assembly type retaining wall of the soil filling slope comprises a plurality of reinforced concrete piles, pile top tie beams and upright columns, wherein the pile top tie beams are arranged at the upper ends of the reinforced concrete piles; intercolumnar tie beams are arranged in the middles of the upright columns; an intercolumnar gap is formed between each two adjacent upright columns; a balancing beam is arranged on the back side of each upright column; an inter-beam gap is formed between each two adjacent balancing beams; a retaining vertical plate is inserted in each intercolumnar gap; and a balancing flat plate is paved in each inter-beam gap. The retaining wall is provided with the reinforced concrete piles, and is well-adapted to geological conditions; balancing beam and slab structures are arranged on the back sides of the upright columns, so that the stress of the whole retaining wall is reasonable, the construction cost for the retaining wall is saved, and the applicable height of the retaining wall is increased; and moreover, the retaining wall has a semi-assembly structure, the curing period of pouring baffles is avoided, the construction speed is increased, and anchor cables are not required in the retaining wall, so that potential safety hazards caused by the reason that the anchor cables are easy to corrode and poor in durability are avoided.
Owner:SHENZHEN GONGKAN GEOTECHN GRP

Trajectory prediction system and method, electronic equipment and readable storage medium

The invention provides a trajectory prediction system and method, electronic equipment and a readable storage medium, and the method comprises the steps: obtaining the historical position of an automatic vehicle in a world coordinate system, the historical relative position of a to-be-predicted object relative to the automatic vehicle, and the environment information of the to-be-predicted object, based on the historical position of the automatic vehicle in the world coordinate system, the historical relative position of the to-be-predicted object relative to the automatic vehicle and the environment information of the to-be-predicted object, obtaining the historical positions of the to-be-predicted object and surrounding obstacles in the world coordinate system; according to the historical positions of the to-be-predicted object and the surrounding obstacles in the world coordinate system, obtaining and semantically extracting the relative historical trajectory of the to-be-predicted object based on the historical relative positions of the to-be-predicted object relative to the surrounding obstacles, and combining the relative historical trajectory with the lane information subjected to semantic extraction to obtain a semantic historical trajectory; and inputting the semantic historical trajectory into the trajectory prediction model to perform trajectory prediction of the to-be-predicted object. According to the method, the unmanned driving computing power is greatly improved, the computing consumption in the unmanned driving operation is minimized, the prediction precision can be ensured, and the engineering requirements are better met.
Owner:际络科技(上海)有限公司

Novel flexible coast protection structure and construction method thereof

The invention discloses a novel flexible coast protection structure and a construction method of the novel flexible coast protection structure. The structure comprises a mattress tying beam and a wave dissipating platform, wherein the mattress tying beam and the wave dissipating platform are close to the designed water level; the wave dissipating platform is connected with the bottom and the top of a bank slope through a slope and a wave wall respectively; a pebble cushion layer and composite geotextiles are sequentially laid on the lower surface of the slope and the lower surface of the wave dissipating platform. Composite geotextiles and a gravel cushion layer are sequentially laid on the upper surface of the slope and the upper surface of the bottom of the bank slope. A concrete hinged mattress is laid on the gravel cushion layer. The top end of the hinged mattress is connected to the mattress tying beam. The method comprises the steps of prefabrication of concrete ballast block bodies, construction of the mattress tying beam and a bank protection structure above the mattress tying beam, splicing of the concrete hinged mattress, mattress sinking construction and the like. Compared with the existing coast protection technology, the novel flexible coast protection structure has the advantages that the integrity is good, the anti-erosion capability and the coastal erosion deformation adaptability are high, materials are easy to obtain, construction is easy, and maintenance management is convenient; the problem that a traditional rigid seawall bank protector is prone to collapse and damage on the condition of coastal washout deformation can be effectively solved, and a new approach is provided for coast protection.
Owner:HOHAI UNIV

Ultra-wide-band horizontally-polarized omnidirectional connection type Vivaldi circular array antenna

The invention discloses an ultra-wide-band horizontally-polarized omnidirectional connection type Vivaldi circular array antenna, and mainly solves the problems of wide frequency band, omnidirectional horizontal polarization and miniaturization of an antenna cannot be satisfied in the prior art. The ultra-wide-band horizontally-polarized omnidirectional connection type Vivaldi circular array antenna comprises a radiation unit (1), a feeding network (2) and a dielectric plate (3), wherein the radiation unit (1) is a 16-element connecting type Vivaldi antenna array which is formed by a Vivaldi unit around a center in a rotating manner; the feeding network (2) adopts a one-into-sixteen broadband Wilkinson power divider and a coupling microstrip feeder line; electromagnetic energy is coupled to the radiation unit through the coupling microstrip feeder line; the dielectric plate (3) adopts a Kangtaini (a Chinese brand name)dielectric plate with a dielectric constant of 2.55; the radiation unit and the feeding network are printed on the upper and lower surfaces of the dielectric plate; and the centers of the radiation unit and the feeding network coincide with that of the dielectric plate. The circular array antenna has the characteristics of ultra wide band, omnidirectional horizontal polarization and miniaturization, and can be used in a full-coverage ultra-wide-band wireless communication system in the peripheral regions.
Owner:XIDIAN UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products