A connection device and method for a steel pipe column and a seismic isolation support after the building is lifted
A technology of shock-isolation bearings and connection devices, which is applied in the direction of building construction and construction, can solve the problems that the steel pipe column bottom cannot be directly welded and connected, the connection construction period is long, and the connection effect is not good, so as to achieve good connection effect, The effect of shortening the construction period and stabilizing the support
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 2
[0039] This embodiment discloses a connection device between a steel pipe column and a seismic isolation support after the building is jacked up, such as Figure 3-5 As shown, it includes a top board and a bottom board with the same size and arranged in parallel. The top board and the bottom board are both square steel plates. A plurality of first vertical support plates are arranged between the top board and the bottom board. The boards are distributed in a "meter" shape, and the upper and lower ends of the first vertical support board are respectively welded and fixed to the top board and the bottom board.
[0040] A second vertical support plate 14 is also provided between the top plate and the bottom plate. The second vertical support plate is an inverted conical structure, and its upper and lower ends are welded to the top plate and the bottom plate respectively. The second vertical support plate The second vertical support plate is arranged coaxially with the top plate a...
Embodiment 3
[0046]After the building is lifted, the steel pipe column 6 of the building is separated from the seismic isolation support 8 fixed on the foundation structure 7 by high-strength bolts. After the jacking is in place, the steel pipe column of the building needs to be connected to the seismic isolation support , this embodiment discloses the construction method of the connection device between the steel pipe column and the seismic isolation support after the building is jacked up as described in embodiment 1 or embodiment 2, comprising the following steps:
[0047] Step 1: After the building is jacked up, the part of the set length at the bottom of the pier 9 of the steel pipe column is removed, so that the bottom of the vertical steel bar 10 of the reinforcement cage in the pier exposes the set distance of the pier, and the set length It can be determined by those skilled in the art according to actual engineering needs, and will not be described in detail here.
[0048] Step 2...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com