A large-span prefabricated corrugated steel web composite girder top and bottom slab synchronous pouring formwork and its application method
A corrugated steel web and simultaneous pouring technology, which is applied in buildings, bridges, bridge construction, etc., can solve the problems that the construction quality is difficult to guarantee, and the formwork construction quality is greatly affected by the proficiency of workers and site conditions, so as to benefit structural mechanics. High performance, high appearance quality of structures, and tight formwork seams
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] see Figure 1-4 , a large-span prefabricated corrugated steel web composite girder roof and floor synchronous casting formwork, mainly including suspended beam 1, combined inner mold 2, retractable retractable support frame 3, combined positioning side mold 4, side mold Fine-tuning screw support 5, vibration hole 6 on the bottom plate of the combined inner mold, ash hole 7 on the top plate of the combined inner mold, a telescopic support frame 9 and a corrugated pressure plate 16; The side mold fine-tuning screw support 5 can adjust the height of the side mold fine-tuning screw support 5 to accurately adjust the angle of the combined positioning side mold 4; Bolt connection is adopted, and the expansion degree of the top plate of the combined inner mold 2 is controlled by adjusting the retractable telescopic support frame 3, and the top plate of the combined inner mold 2 is fixed; the telescopic support frame 9 is used between the side plates of the combined inner mold ...
Embodiment 2
[0046] A method for using a formwork for synchronous pouring of the top and bottom slabs of a long-span prefabricated corrugated steel web composite girder, which adopts the forms of side-wrapped bottom, measuring-wrapped end, and bottom-wrapped end to realize a synchronous pouring of the top and bottom slabs of a long-span prefabricated corrugated steel web composite girder Purpose.
[0047] A method for using a synchronous pouring formwork for the top and bottom slabs of a large-span prefabricated corrugated steel web composite beam, comprising the following steps:
[0048] Step 1: After binding the bottom layer of the large-span prefabricated corrugated steel web composite beam bottom plate and the tooth block steel bars on the pedestal, install the combined positioning side form 4; use a gantry crane to install the combined positioning side form 4 Hoisting in blocks to the design position;
[0049] Step 2: adjust the fine-tuning screw support 5 of the side form, so that t...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com