Installation construction method of prefabricated steel structural member of prefabricated building
A construction method and steel structure technology, which is applied in the direction of building structure, construction, etc., can solve the problems of unstable lifting of steel structural components, cumbersome installation and operation, and potential safety hazards
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The embodiments of the present invention will be described in detail below with reference to the accompanying drawings, but the present invention can be implemented in a variety of different ways defined and covered by the claims.
[0040] Such as Figure 1 to Figure 8 As shown, a method for installation and construction of prefabricated steel structural components of prefabricated buildings includes the following steps:
[0041] S1. Box-type column connector installation: First, weld the outer side of the box-shaped column that needs to be installed with the steel structure component, so that the steel structure component can be locked on the connector;
[0042] S2. Placement of steel structure components: place the surface-treated steel structure components on the supporting plate 2 installed on the top of the lifting vertical plate 1, and lock the steel structure components through the locking mechanism 3 installed on the supporting plate 2;
[0043] S3. Preparation for lift...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com