Wall-to-ground connection device and connection method for construction engineering
A technology of construction engineering and ground connection, which is applied in the direction of construction, building structure, floor, etc., and can solve the problems of low applicability and troubles of wall-to-ground connection devices
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0043] refer to figure 1 , image 3 , is a wall connection device for construction engineering disclosed by the present invention, comprising a bottom plate 1, a first vertical plate 11 and a second vertical plate 12 are arranged on both sides of the bottom plate 1, and the first vertical plate 11 and the second vertical plate 12 They are parallel to each other and are perpendicular to the bottom plate 1. The bottom plate 1 includes a bottom tube plate 2 and a bottom slide plate 3. The bottom tube plate 2 is hollow inside and has an open end, while the inside of the bottom slide plate 3 is hollow. The bottom slide plate 3 is located inside the bottom tube plate 2. One end opening of the bottom tube plate 2 is provided with a threaded rod 21, and the bottom slide plate 3 is fixed with a threaded tube 31. The threaded tube 31 is threaded on the threaded rod 21; the bottom slide plate 3 is slidably inserted into the bottom tube plate 2, the first vertical plate 11 is connected w...
Embodiment 2
[0051] A wall-to-ground connection method, comprising the following steps:
[0052] Step 1. Use a tape measure or ruler to measure the thickness of the wallboard to be installed, and record the data, then open the circular shutter 231, insert the rectangular insert rod 61 on the crank handle 6 into the rectangular insert rod at the end of the threaded rod 21. In the groove 211, turn the crank handle 6 to rotate the threaded rod 21, let the threaded cylinder 31 move along the length direction of the threaded rod 21, and then drive the bottom slide plate 3 to move in the bottom cylinder plate 2, and adjust the width of the bottom plate 1. At this time, The distance between a vertical board 11 and the second vertical board 12 is equal to the width of the bottom plate 1 after adjustment, measure the distance between the first vertical board 11 and the second vertical board 12, so that the first vertical board 11 and the second vertical board The distance between 12 is equal to the...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


