Visual monitoring and management method of unearthed excavation in shield tunneling construction and visual monitoring and management system of excavated volume

A technology for monitoring management and unearthed volume, applied in the direction of earthwork drilling, weighing, measuring devices, etc., can solve the problems such as imperfect data processing and display functions of unearthed volume, unconsidered, unable to meet different working conditions, etc., to achieve systematic processing And the effect of intuitive display interface and complete functions

Active Publication Date: 2020-11-27
CHINA UNIV OF MINING & TECH (BEIJING)
View PDF9 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, there are deficiencies in this system: ①It is only conventional measurement and display, without considering many influencing factors of the excavated amount in the actual construction process, and without considering the relationship between the theoretical excavated amount, the measured excavated amount and the actual excavated amount; ②It is not based on the actual real-time adjustment and correction of shield construction parameters; ③The system interface has limited functions and cannot display shield-related construction parameters in real time, and cannot meet the needs of different working conditions and different construction personnel; ④The excavation volume data processing and display functions are not perfect , the unearthed status and existing problems cannot be directly reflected through the data; ⑤ The unearthed data can only be displayed in the shield cab, which is inconvenient for on-site construction personnel and relevant management personnel to view

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Visual monitoring and management method of unearthed excavation in shield tunneling construction and visual monitoring and management system of excavated volume
  • Visual monitoring and management method of unearthed excavation in shield tunneling construction and visual monitoring and management system of excavated volume
  • Visual monitoring and management method of unearthed excavation in shield tunneling construction and visual monitoring and management system of excavated volume

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0040] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, the embodiments of the present invention will be further described in detail below in conjunction with the embodiments and the accompanying drawings. Here, the exemplary embodiments and descriptions of the present invention are used to explain the present invention, but not to limit the present invention.

[0041] In describing the present invention, it should be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", " "Outside" and other indication orientations or positional relationships are based on the orientations or positional relationships shown in the drawings, which are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device, component or structure must have a specific orientation, Construction or ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a shield construction excavation visual monitoring management method and an excavation amount visual monitoring management system. The system comprises a shield PLC, a belt weigher, a wireless communication module and terminal equipment. The belt weigher is arranged on a shield tunneling machine belt conveyor and can collect shield construction parameters, and the excavationspeed, the pushing speed or the pushing stroke, the instant excavation amount and the current ring excavation amount are at least obtained through operation. The method comprises two parts includingexcavation speed monitoring management and excavation amount monitoring management. By means of the shield construction excavation visual monitoring management method and the excavation amount visualmonitoring management system, the excavation amount changing situation can be accurately and truly reflected in the shield tunneling process, analysis, evaluation and control on the excavation processand the final excavation amount are achieved, and process and result monitoring is conducted on shield construction. A system processing and display interface is visible, functions are complete, therequirements of different work conditions and different construction personnel can be met, and monitoring of a shield cab, field construction personnel and related management personnel is facilitated.

Description

technical field [0001] The invention relates to the technical field of shield tunneling construction, in particular to a method for visual monitoring and management of unearthed excavation in shield tunneling construction and a visual monitoring and management system for unearthed quantity. Background technique [0002] Earth pressure balance shield is the main equipment of shield tunneling method. The control of excavation volume is an important content in the construction management of earth pressure balance shield tunneling. In the construction of earth pressure balance shield, it is necessary to control the excavation volume by adjusting the speed of the screw conveyor. , so that the unearthed volume and the excavation volume of the shield machine are balanced, so that the excavation surface of the shield machine is in a stable state. Excessive unearthed volume will lead to excessive stratum loss of the excavation surface and cause excessive subsidence of the surface; to...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21D9/06E21D9/093E21D9/12E21F17/18G01G11/00
CPCE21D9/06E21D9/093E21D9/12E21F17/18G01G11/00
Inventor 杨志勇江玉生孙正阳邵小康景晨钟白志强
Owner CHINA UNIV OF MINING & TECH (BEIJING)
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products