Vertical shaft lining construction method
A construction method and lining technology, which can be applied in wellbore lining, shaft equipment, earthwork drilling, etc., can solve the problems of high labor intensity, complicated process, and low efficiency, and achieve the effects of reducing workload, simple operation, and fast construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0044] Such as Figure 1-2 As shown, this embodiment provides a shaft lining device, which includes a lifting device 1, two suspension anchor devices 2, and a suspension plate formwork device 3. The lifting device 1 includes a gantry crane, and the gantry crane is located above the shaft. Two The suspension anchoring device 2 is symmetrically fixed around the shaft mouth, and the suspension anchoring device 2 is provided with a suspension wire rope and a rope clamp;
[0045] Such as Figure 1-3 As shown, the hanging plate formwork device 3 includes an upper hanging plate 9, a column 4 and an operation platform 10, and the two ends of the column 4 are fixedly connected with the upper hanging plate 9 and the operating platform 10 respectively, specifically, the two ends of the column 4 are connected with the upper hanging plate 9 respectively. Connect with the operating platform 10 bolts;
[0046] Such as Figure 3-4 As shown, the upper hanging plate 9 is provided with liftin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



