Plate-type anchorage structure and construction method thereof
An anchoring and slab technology, applied in bridge parts, erecting/assembling bridges, bridges, etc., can solve the problems of increasing construction costs and construction risks, and achieve the effects of reducing the risk of excavation and collapse, shortening the construction period, and improving the anchoring force.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Such as Figure 1-6 As shown, a plate-type anchorage structure includes a pressure bearing plate 1 and an anchorage, the anchorage is arranged on the pressure bearing plate 1, and the anchorage and the pressure bearing plate 1 are integrally cast and formed, so The pressure bearing plate 1 is covered with backfill soil 12, and the backfill soil 12 is adapted to the original ground.
[0041]During construction, a foundation pit is excavated on the ground, and the excavated backfill soil 12 is placed aside for later use, and then steel bars are bound in the foundation pit, and then the pressure-bearing structure is formed by one-time pouring or multiple pouring of concrete. Plate 1 and the anchorage. The height of the pressure bearing plate 1 is smaller than the height of the foundation pit, so that the pressure bearing plate 1 is arranged below the original ground. The anchor is arranged on the bearing plate 1, and the anchor is used for connecting the buckle cable. A...
Embodiment 2
[0052] A construction method for a plate anchorage structure, comprising the following steps:
[0053] Step 1: Excavate the foundation pit and level and roll it, excavate several pile holes in the foundation pit, put the excavated backfill soil 12 aside for later use, and hoist several steel cages into the corresponding piles in sequence In the holes, concrete is poured sequentially in several of the pile holes to form several pile foundations 5;
[0054] Step 2: Bind the steel bars of the bearing plate 1 in the foundation pit, bury the steel bars of two caps, two anchorage units 2, eight stiffeners 4 and two beams 3, install the two caps, two A template for one anchor unit 2, eight stiffeners 4, and two beams 3, and several pre-embedded pipes are respectively arranged on the two anchor units 2;
[0055] Step 3: Concrete is poured in the foundation pit, and the pressure-bearing plate 1 is formed by pouring multiple times, and the next layer of concrete is poured before the in...