[0025] The present invention will be described in detail below in conjunction with the drawings. The enumerated embodiments can enable those skilled in the art to better understand the present invention, but do not limit the present invention in any form.
[0026] Such as figure 1 As shown, a dam concrete prestressed anchor cable demolition sampling method is mainly aimed at the current hydraulic dam 1, which is demolished by blasting from top to bottom and layer by layer downward. The removal method is:
[0027] 1.1) Before the demolition of the whole concrete blasting, use the breaking hammer to break the anchor pier, remove the internal tension of the anchor cable naturally, check the shrinkage of the anchor cable, and evaluate the internal residual tension to guide the subsequent demolition of the anchor cable; before the demolition of the whole concrete blasting , first measure the length of the exposed end of the anchor cable, as an important reference for subsequent me...