Road and bridge construction pavement crushed stone line drawing device
A bridge construction and gravel technology is applied in the field of road and bridge construction pavement gravel line drawing devices, which can solve the problems of inability to draw various widths of traffic lines and single specification of line drawing devices, so as to prevent sedimentation and improve the quality of line drawing. , the effect of reducing waste
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] This embodiment 1 introduces a device for drawing lines on pavement gravels in road and bridge construction. The left side of the top of the frame plate 1 is provided with a cabinet 2, and a storage battery is arranged inside the cabinet 2. In this paper, all electrical components are connected to the storage battery through wires. 2 top left side is provided with storage box 3, and frame board 1 top right side is provided with outer bucket 4, and outer bucket 4 inside is provided with paint bucket 23, and during use, paint bucket 23 inside filling is provided with marking paint, marking line The paint is a normal temperature (cold coating) road marking paint common on the market. A motor seat 5 is welded on the left side of the outer barrel 4. A shield 6 is connected between the motor seat 5 and the top of the outer barrel 4. The inside of the shield 6 is provided with a drive device, the driving device includes a motor installed on the top of the motor base 5 and a rot...
Embodiment 2
[0033] This embodiment 2 introduces a line drawing device for gravel on road and bridge construction, a line drawing device for gravel on road and bridge construction, including a frame plate (1), and the left side of the top of the frame plate (1) is set There is a cabinet (2), a storage box (3) is arranged on the left side of the top of the cabinet (2), an outer barrel (4) is arranged on the right side of the top of the rack board (1), and the outer barrel (4) A paint bucket (23) is arranged inside, the edge of the frame plate 1 is polished to smooth, a moving wheel 1111 is installed on the right side of the frame plate 1, two moving wheels 1111 are installed on the left side of the frame plate 1, and the front end of the frame plate 1 A line drawing box 7 is fixed, and the right side of the line drawing box 7 top is provided with a rectangular opening 71, and the bottom of the upper open pipe 21 faces the rectangular opening 71, and the side of the line drawing box 7 near th...
Embodiment 3
[0035] This embodiment 3 introduces a device for drawing lines on gravels in the construction of roads and bridges. The top right side of the board 1 is provided with an outer barrel 4, the interior of the outer barrel 4 is provided with a paint bucket 23, the top of the rear end of the outer barrel 4 is provided with a connected feed port 41, and the bottom of the front end of the outer barrel 4 is provided with an outer discharge port 43. A rectangular tube 42 is welded on the outside of 43, and a gate 20 for adjusting the flow rate is installed inside the rectangular tube 42. A pressure rod 9 is fixedly connected to the middle of the front end of the gate 20, and the other end of the pressure rod 9 extends to the left end of the chassis 2 and is provided with a handle. The pressing rod 9 is rotated in the middle and installed on the outer wall of the front end of the cabinet 2, and the bottom of the rectangular tube 42 is welded to the downwardly inclined upper open tube 21;...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


