Boiler group scheduling optimization method and device

An optimization method and boiler group technology, applied in genetic rules, instruments, data processing applications, etc., can solve the problems of insufficient rationality of scheduling methods, low cost, and failure to reach the scheduling state, so as to improve intelligent scheduling capabilities and avoid load distribution unreasonable effect

Pending Publication Date: 2020-09-08
XINAO SHUNENG TECH CO LTD
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

For boiler groups with multiple steam boilers, how to reasonably schedule them, and to achieve the lowest energy consumption, highest efficiency, and lowest cost under the condition of meeting the steam load of users is a key issue. Optimal scheduling is a key issue faced by distributed energy. Frequent fluctuations in user load and a large number of energy supply equipment will lead to insufficient rationality of the scheduling method based on the subjective experience of personnel, and cannot realize the consumption reduction potential of the energy supply group
[0003] At present, there are few researches on boiler group scheduling optimization. On-site operators mostly schedule and distribute boiler loads based on personal subjective experience, or use mechanical fixed-value scheduling methods, such as distributing the total load to each boiler equally, or Some boilers are artificially designated as peak-shaving boilers, and the load changes are all borne by the peak-shaving boilers, which often cannot achieve the optimal scheduling state, so that the energy-saving potential of group operation cannot be exerted

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Boiler group scheduling optimization method and device
  • Boiler group scheduling optimization method and device
  • Boiler group scheduling optimization method and device

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0030] see figure 1 , is a boiler group scheduling optimization method provided by an embodiment of the present invention, including:

[0031] Step S11: setting the optimization target of the boiler group according to the gas consumption of the boilers in the boiler group within a specified time period;

[0032] Step S12: according to the amount of steam generated by the boilers in the boiler group within a specified period of time, set the constraint conditions for optimizing the optimization target;

[0033] Step S13: establishing a differential evolution algorithm model for optimizing the optimization objective;

[0034] Step S14: According to the constraints and the differential evolution algorithm model, at least calculate the optimization target associated parameters when the optimization target meets the preset conditions, so as to obtain the load distribution plan of the boiler group, and complete the boiler Group scheduling optimization.

[0035] The optimization m...

Embodiment 2

[0063] see figure 2 , is a boiler group scheduling optimization device provided by an embodiment of the present invention, including: a target setting module 21, a condition setting module 22, a model building module 23 and an optimization solution module 24, wherein,

[0064] The target setting module 21 is used to set the optimization target of the boiler group according to the gas consumption of the boilers in the boiler group within a specified time period;

[0065] The condition setting module 22 is used to set the constraint conditions for optimization of the optimization target according to the amount of steam generated by the boilers in the boiler group within a specified time period;

[0066] The model building module 23 is used to set up a differential evolution algorithm model that optimizes the optimization target;

[0067] The optimization solution module 24 is used to at least calculate the optimization target associated parameters when the optimization target ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention is suitable for the technical field of steam boiler scheduling analysis, and provides a boiler group scheduling optimization method and device, and the method comprises the steps: setting an optimization target of a boiler group according to the gas consumption of boilers in the boiler group in a specified time period; setting constraint conditions for optimizing the optimization target according to the steam quantity generated by the boilers in the boiler group in the specified time period; establishing a differential evolution algorithm model for optimizing the optimization target; and according to the constraint condition and a differential evolution algorithm model, at least calculating an optimization target associated parameter when the optimization target meets a preset condition to obtain a load distribution plan of the boiler group, and completing scheduling optimization of the boiler group. On the basis of the differential evolution algorithm, searching and optimizing are carried out from the global level, intelligent load scheduling is achieved, unreasonable load distribution caused by subjective experience or mechanical operation of operators is avoided, and the group operation energy-saving potential caused by boiler individual differences is mined to the maximum extent.

Description

technical field [0001] The invention belongs to the technical field of steam boiler scheduling analysis, and in particular relates to a boiler group scheduling optimization method and device. Background technique [0002] With the development of industrial concentration areas and industrial parks, the demand for industrial steam and central heating continues to increase, and central heating energy stations equipped with multiple gas-fired steam boilers continue to appear. For boiler groups with multiple steam boilers, how to reasonably schedule them, and to achieve the lowest energy consumption, highest efficiency, and lowest cost under the condition of meeting the steam load of users is a key issue. Optimal scheduling is a key issue faced by distributed energy. Frequent fluctuations in user load and a large number of energy supply equipment will lead to insufficient rationality of the scheduling method based on the subjective experience of personnel, and the energy consumpt...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06N3/12
CPCG06Q10/04G06Q10/06311G06Q50/06G06N3/126
Inventor 陈鑫孔飞牛辰庚
Owner XINAO SHUNENG TECH CO LTD