Bearing and enclosing system for foundation pit of super high-rise building
An enclosure system and super high-rise technology, applied in construction, infrastructure engineering, excavation, etc., can solve the problems of deflection and deformation of the bottom plate and the damage of the foundation pit structure, so as to reduce the stress concentration, reduce the project cost, and avoid the buckling deformation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0025] see Figure 1-2 , a super high-rise building foundation pit load-bearing enclosure system, comprising a foundation pit main frame 1, the foundation pit main frame 1 is composed of an upper frame 2, a lower frame 3, a support structure 4 and a surrounding wall 12, the upper frame 2 and The lower frame 3 is fixed and supported by several supporting structures 4; the lower frame 3 is provided with several bearing piles 5 extending into the foundation, wherein the upper end of each bearing pile 5 is connected to the lower frame 3. Fixedly connected; the upper frame 2 and the lower frame 3 are provided with several transverse load-bearing structures 6 and longitudinal load-bearing structures 7 located in the horizontal plane, the upper end of the support structure 4 is connected with the transverse load-bearing structure 6 set on the upper frame 2 And the fixed connection between the longitudinal load-bearing structure 7 is integrated, and the lower end of the support struct...
Embodiment 2
[0035] see Figure 1-2 , a super high-rise building foundation pit load-bearing enclosure system, comprising a foundation pit main frame 1, the foundation pit main frame 1 is composed of an upper frame 2, a lower frame 3, a support structure 4 and a surrounding wall 12, the upper frame 2 and The lower frame 3 is fixed and supported by several supporting structures 4; the lower frame 3 is provided with several bearing piles 5 extending into the foundation, wherein the upper end of each bearing pile 5 is connected to the lower frame 3. Fixedly connected; the upper frame 2 and the lower frame 3 are provided with several transverse load-bearing structures 6 and longitudinal load-bearing structures 7 located in the horizontal plane, the upper end of the support structure 4 is connected with the transverse load-bearing structure 6 set on the upper frame 2 And the fixed connection between the longitudinal load-bearing structure 7 is integrated, and the lower end of the support struct...
Embodiment 3
[0051] see Figure 1-2 , a super high-rise building foundation pit load-bearing enclosure system, comprising a foundation pit main frame 1, the foundation pit main frame 1 is composed of an upper frame 2, a lower frame 3, a support structure 4 and a surrounding wall 12, the upper frame 2 and The lower frame 3 is fixed and supported by several supporting structures 4; the lower frame 3 is provided with several bearing piles 5 extending into the foundation, wherein the upper end of each bearing pile 5 is connected to the lower frame 3. Fixedly connected; the upper frame 2 and the lower frame 3 are provided with several transverse load-bearing structures 6 and longitudinal load-bearing structures 7 located in the horizontal plane, the upper end of the support structure 4 is connected with the transverse load-bearing structure 6 set on the upper frame 2 And the fixed connection between the longitudinal load-bearing structure 7 is integrated, and the lower end of the support struct...
PUM

Abstract
Description
Claims
Application Information

- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com