Concrete wall leveling device for construction
A technology for concrete walls and buildings, which is applied in the direction of architecture and building construction, and can solve problems such as the inability to adjust the concrete wall, the inability to adjust the position of the concrete wall, etc., and achieve the effects of increasing practicability, reducing shaking, and increasing stability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A concrete wall smoothing device for construction, such as Figure 1-4 As shown, it includes a mounting plate 1, wheels 2, rotating assembly, lifting assembly, and shoveling assembly. The mounting plate 1 is used to install the entire device. The bottom of the mounting plate 1 is provided with wheels 2, and the top of the mounting plate 1 is provided with a rotating assembly. There is a lifting component on the top of the rotating component, which can be lifted and lowered by sliding. The lifting component is equipped with a shoveling component, which can be shoveled through continuous contact.
[0022] Such as figure 1 , 2 As shown in and 4, the rotating assembly includes a sliding rod 4, a ring gear 5, a gear 6, a first sliding sleeve 7, a first clamping rod 8 and a first spring 9, and a circular chute 3 is opened on the top of the mounting plate 1 for sliding There are four rods 4, a sliding rod 4 is provided in the sliding type of the circular chute 3, a ring gear...
Embodiment 2
[0030] Such as figure 1 with 3 As shown, on the basis of Embodiment 1, an arc-shaped stopper 21 is also included. The arc-shaped stopper 21 is provided on the top of the arc-shaped shovel plate 20, and the arc-shaped stopper 21 is elastic.
[0031] Such as figure 1 , 2 Shown in and 3, on the basis of embodiment 1, also include telescopic rod 22 and the 3rd spring 23, the quantity of telescopic rod 22 is identical with wheel 2, is welded with telescopic rod 22 at the bottom of installation plate 1, and telescopic rod 22 bottoms A wheel 2 is provided, and a third spring 23 is connected between the wheel 2 and the telescopic rod 22 .
[0032] The specific operation process of the above-mentioned embodiment: when the arc shovel 20 removes excess cement, the cement contacts the arc block 21, so that the cement slides to the left and right sides of the arc block 21, so that the excess cement can be removed. Do not remain on the arc shovel plate 20.
[0033] When the equipment i...