Segmented bent cap dry-connection installation system and assembly construction method of bridge

A technology of installation system and construction method, which is applied in the direction of erecting/assembling bridges, bridges, bridge parts, etc., can solve the problems of difficult positioning and matching, and achieve the effects of low safety risk, short lifting time and high splicing efficiency

Pending Publication Date: 2020-10-13
中铁大桥局上海工程有限公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] Therefore, the embodiment of the present invention provides a segmented cap beam dry joint installation system and a bridge assembly construction method, which can effectively solve the problem of difficult positioning and matching of segmented prefabricated cap girders during the assembly construction process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Segmented bent cap dry-connection installation system and assembly construction method of bridge
  • Segmented bent cap dry-connection installation system and assembly construction method of bridge
  • Segmented bent cap dry-connection installation system and assembly construction method of bridge

Examples

Experimental program
Comparison scheme
Effect test

no. 1 example

[0041] see figure 1, which is a schematic elevation view of a segmented cover beam dry joint installation system 100 provided in an embodiment of the present invention. The segmented cover beam dry joint installation system 100 includes, for example: a plurality of columns 110 , The main cover beam section 120 and the two cover beam cantilever sections 130 respectively connected to the two sides of the main cover beam section 120 . Wherein, the plurality of upright columns 110 are arranged vertically on the ground in at least two rows, and the cover beam main section 120 is arranged on the top of the plurality of upright columns 110 .

[0042] Preferably, each cover beam cantilever section 130 is respectively provided with at least one suspension point 140, and vertically connects the side of the cover beam cantilever section 130 close to the column 110, for the cover beam cantilever section 130 and the cantilever beam Connection. For example, each cover beam cantilever segm...

no. 2 example

[0058] see Figure 6 , which is a schematic flow chart of the construction method for the dry joint installation of segmented cap beams provided in the second embodiment of the present invention; including:

[0059] Step S1, prefabricating the main section 120 of the cover beam and the two matching cantilever sections 130 of the cover beam;

[0060] Step S2, installing the cap beam main section 120 to the top ends of at least two columns 110 at predetermined positions;

[0061] Step S3, arranging a plurality of pad beams 200 on the cover beam main section 120 and locking the distribution beam 180;

[0062] Step S4, apply epoxy resin glue layer 126 on the two sides of the main cover beam section 120 respectively, and hang the two cantilever sections 130 of the cover beam on both sides of the main cover beam section 120 through the distribution beam 180;

[0063] Step S5, tensioning the tensioning device 150 connected between the main section 120 of the cover beam and the cant...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention discloses a construction method and system for dry connection installation of a segmented bent cap. The segmented bent cap dry-connection installation system comprisesat least two stand columns, a bent cap main section, two bent cap cantilever sections, two tensioning devices and an epoxy resin adhesive layer, wherein the bent cap main section is connected to the top ends of the at least two stand columns; the two bent cap cantilever sections are connected to the two sides of the bent cap main section respectively; the two tensioning devices are respectively connected between the two bent cap cantilever sections and the bent cap main section; and the epoxy resin adhesive layer is clamped between the bent cap main section and the bent cap cantilever sections. The embodiment of the invention effectively solves the problem that the segmented prefabricated bent cap is difficult to position and match in the splicing construction process.

Description

technical field [0001] The invention relates to the technical field of road and bridge construction, in particular to a segmented cover beam dry joint installation system and a bridge assembly construction method. Background technique [0002] With the rapid development of our country's economy, our country's bridge construction has also developed rapidly. In the process of bridge construction, the prefabricated assembly construction technology can significantly shorten the construction period and reduce the construction time. At the same time, it has the advantages of high construction quality, low safety risk and environmental protection. Therefore, prefabricated assembly construction technology has been widely used in municipal bridge construction; however, in the actual construction process, due to the limitation of transportation conditions and hoisting weight, more prefabricated cap beams need to be prefabricated in sections and assembled on site construction. [000...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E01D19/02E01D21/00
CPCE01D19/02E01D21/00
Inventor 蔡学峰梁辉李江王彦强李德昆向考黄勇郑学锦李亮亮
Owner 中铁大桥局上海工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products