Embodiment 1
[0031] This example discloses a real-time measurement method for the kinetic energy of the drilling support platform based on visual positioning, such as figure 1 shown, including the following steps:
[0032] S1 collects images of different postures of the drilling support platform as the training atlas of the convolutional neural network.
[0033] The images of different attitudes are obtained by the camera, the nonlinear model of the camera is established, the distortion parameters of the camera are obtained through the nonlinear model of the camera, and the images of different attitudes are corrected according to the distortion parameters.
[0034] Among them, the process of establishing the nonlinear model of the camera is:
[0035] Such as figure 2 As shown, suppose a point P in 3D space W (X W ,Y W ,Z W ) in the camera coordinate system is (X C ,Y C ,Z C ), the coordinates projected in the image physical coordinate system are (x, y), and the upper left corner ...
Embodiment 2
[0068] Based on the same inventive concept, this embodiment also discloses a real-time measurement system for kinetic energy of drilling support platform based on visual positioning, including:
[0069] The training atlas acquisition module is used to collect images of different postures of the drilling support platform as the training atlas of the convolutional neural network;
[0070] The model training module is used to establish the original convolutional neural network, input the training atlas to train the original convolutional neural network, and obtain the final convolutional neural network model;
[0071] The feature point acquisition module is used to collect the real-time image of the drilling support platform, and input it into the convolutional neural network model to obtain the image coordinates of the feature points of the drilling support platform;
[0072] The attitude information acquisition module is used to calculate the attitude information of the drillin...