A construction method for replacing plate bearings of rail transit with disc bearings

A technology for rail transit and construction methods, applied in construction, bridge construction, bridges, etc., can solve the problems of inability to complete synchronous jacking, replacement of pads, affecting the normal operation of the line, and short time of skylight points, so as to achieve efficient and convenient construction process. , The effect of reducing high risk, saving construction time and cycle

Active Publication Date: 2022-05-17
武汉比邻工程技术有限公司
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, this construction method needs to complete the whole process of synchronous jacking, pad stone replacement, and support replacement in a complete cycle; however, rail transit needs to be carried out within the skylight point (do not exclude auxiliary work during the daytime construction), and a single skylight Due to the short time, it is impossible to complete the whole process of synchronous jacking, pad stone replacement, support replacement, etc. The traffic may be interrupted, which will inevitably affect the normal operation of the line during the construction process.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for replacing plate bearings of rail transit with disc bearings
  • A construction method for replacing plate bearings of rail transit with disc bearings
  • A construction method for replacing plate bearings of rail transit with disc bearings

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0047] Take a certain urban rail transit line as an example for construction. The skylight point is from 00:00 to 4:00 every day, and the railway line needs to be in normal operation during the day.

[0048] A construction method for replacing a disc-type bearing with a rail transit slab-type bearing, which includes the following four stages in sequence: a preparation stage, a first jacking stage, a pad stone replacement stage, and a second jacking stage; wherein, the preparation stage and the pad stone replacement stage is completed in the non-skylight point, and the first jacking stage and the second jacking stage are completed in the skylight point;

[0049] Both the first jacking stage and the second jacking stage adopt the construction method of longitudinal split piers and horizontal synchronous jacking beams, and both include the release of the upper restraint force, the overall jacking, and the release of the upper restraint force. Steps for recovery, data acquisition ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a construction method for replacing a disc-type bearing with a rail transit plate-type bearing, which sequentially includes a preparation stage, a first jacking stage, a pad stone replacement stage and a second jacking stage; the preparation stage and the pad The construction of the stone replacement stage is completed in the non-skylight point, and the construction of the first jacking stage and the second jacking stage is completed in the skylight point; the first jacking stage and the second jacking stage The lifting stages all include the steps of releasing the upper restraint force, overall jacking, recovery of the upper restraint force, data collection after jacking, and disassembly and maintenance of the jacking system; Take out the plate support, and install the disc support during the overall jacking in the second jacking stage; this construction method adopts the method of "uninterrupted traffic, vertically separated piers, and horizontal synchronous jacking of beams" Replacing the support and making full use of train skylight points and non-skylight points for construction will have little impact on the operation of existing track lines.

Description

technical field [0001] The invention relates to the technical field of rail transit construction, in particular to a construction method for replacing a disc-type support with a plate-type support for rail transit. Background technique [0002] In recent years, my country's urban rail transit industry has developed rapidly, and the number of urban rail transit operating lines has continued to increase. Existing rail transit can be built underground, on the ground or on a viaduct; if it is built on a viaduct, the upper structure of the viaduct must be connected to the lower structure with supports to ensure that various loads of the upper structure are transferred to the piers and abutments, and It can adapt to the displacement (displacement and rotation angle) caused by factors such as live load, temperature change, and concrete shrinkage, so that the actual stress of the upper and lower structures conforms to the design calculation model. [0003] However, under a period o...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E01D22/00E01D19/00E01D19/02E01D19/04
CPCE01D22/00E01D19/00E01D19/02E01D19/04
Inventor 贺军许国华乔荣李炎枝周芳张方黄炎褚金鹤蒋苏峰沈华
Owner 武汉比邻工程技术有限公司