The present invention discloses a steel-making production process intelligent scheduling method which comprises the steps of (1) inputting a production plan which comprises a production order and a hot delivery and hot charging production plan given by a hot rolling workshop, (2) decompositing a working plan, calculating the number of slabs, and decompositing the order according to steel types, slab specifications and delivery dates, (3) scheduling a cast order, and scheduling each casting according to a continuous casting machine usage condition and the difference between order delivery dates, (4) collecting a characteristic signal and obtaining bottom layer equipment key position characteristic signal through a corresponding sensor, (5) executing a crane preferred algorithm, (6) switching a transport task state, (7) rearranging a plan, and (8) displaying the rearranged plan to dispatchers in the form of a Gantt diagram. According to the method, the production safety in the steel-making process is ensured, the production operating cost is reduced, the energy is saved, the enterprise management is enhanced, the production efficiency is improved, and the enterprise performance maximization is facilitated.