Telescopic equipment for leveling tile pasting surface
A technology for ceramic tiles and equipment, applied in the field of decoration auxiliary equipment, can solve the problems of reducing the frequency of use of rubber hammers, inconsistent depth of tile adhesive surfaces, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] See attached Figure 1-9 As shown, the telescopic equipment for leveling the ceramic tile paste surface includes: telescopic assembly 10, the telescopic assembly 10 is arranged in a row and the tiles are laid on the telescopic assembly 10, the telescopic assembly 10 includes a vertically arranged support screw 50, the support screw 50 The bottom is threadedly connected with a connecting sleeve 53, the upper port of the connecting sleeve 50 is threadedly connected with the support screw 50, the upper end of the support screw 50 is connected with the lifting adjustment box 40, and the center of the upper part of the lifting adjustment box 40 is provided with a third hole 43 with a half pass. The three-hole body 43 is internally threaded with a connection base 42, the bottom of the connection base 42 has a connection cylinder 423 threaded with the third hole body 43, and the side of the connection base 42 is provided with an auxiliary bump 424 for pushing the connection bas...
Embodiment 2
[0040] Using the method of using telescopic equipment for leveling the pasted surface of tiles, the steps are as follows:
[0041] -Clean and level the bottom surface of the paving, and then use a wire brush to roughen the bottom surface of the paving;
[0042] -Arrange the telescopic components 10 on the ground in a row, specifically in a rectangular row, and arrange the spacing according to the length and width of the tiles; The tiles are placed at intervals of 90°, and gaps are reserved between the tiles. The gap between the reserved tiles is 1mm, and the thickness of the gap is the thickness of the limit plate 411;
[0043] -Placing a level on the top of the tiles, filling the bottom of the tiles with concrete;
[0044] - When the tiles are uneven, adjust the flatness of the tiles by rotating the connecting base 42 or the screw connection height of the lifting adjustment box 40 relative to the support screw 50, because the upper end of the telescopic assembly 10 is placed...
Embodiment 3
[0050] This embodiment is optimized as follows on the basis of Embodiment 1: the insertion slot 44 is a half-through slot, the height of the slot is greater than the thickness of the first connecting plate 20, and the difference between the two should be less than 1mm. The slotted hole 44 and the first connection plate 20 are connected in a plug-in manner, and of course it is not limited to this and can also be an adhesive method. The second strip 21 on the first connection plate 20 is a strip of rubber material. In order to improve the stability of the insertion, of course, the upper and lower groove walls in the insertion slot 44 can be provided with a strip corresponding to the second strip 21 to improve the stability of the insertion. Optionally, the first connecting plate 20 After plugging with the socket slot 44, glue is used to glue the socket to realize the fixed connection between the two.
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


