Prefabricated regular triangular prism dam building and its construction method

A construction method and technology of triangular prisms, which are applied in the direction of dams, barrages, weirs, etc., can solve problems such as increasing the amount of earth and stone works, throwing and filling bodies being washed away by water bodies, and difficulty in fitting regular triangular prisms tightly. , to achieve the effect of improving efficiency, improving accuracy and reducing difficulty

Active Publication Date: 2022-01-25
四川港航建设工程有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] In the construction process of gravity earth-rock dams, it often happens that the dumping and filling bodies are washed away by the water body, which will not only increase the amount of earthwork works, but also have adverse effects on the water environment
[0003] Compared with conventional earth-rock mixed dams, the triangular platform throwing dam has the advantages of resource saving and high construction efficiency. Although it has been successfully applied in some projects, it has always been an important aspect of engineering construction in the preparation of regular triangular platform blocks and oriented filling. At the same time, for the dam project that requires high impermeability performance, how to realize the close fit between the triangular truss and other dam materials is also a difficulty in engineering control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated regular triangular prism dam building and its construction method
  • Prefabricated regular triangular prism dam building and its construction method
  • Prefabricated regular triangular prism dam building and its construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.

[0049] In describing the present invention, it is to be understood that the terms "opening", "upper", "lower", "thickness", "top", "middle", "length", "inner", "surrounding" etc. Indicating orientation or positional relationship is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the components or elements referred to must have a specific orientation, be constructed and operated in a sp...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a prefabricated regular triangular prism dam and a construction method. An integral formwork is used to prepare the regular triangular prism, and a bottom form connecting hole is arranged on the integral bottom form; it can be controlled by the inner guide groove pipe and the outer guide groove pipe The filling position of the sand bag at the bottom of the dam is limited by the lateral position control plate, and the sand bag of the dam body is compacted by the compaction control body and the transverse compression plate; the sliding plate of the position control body can be synchronized Drive the fabric rotating shaft, slope scraping plate and sand filling tank pipe to move along the rolling pavement slide rail, and can simultaneously complete the filling and scraping of the sand and pebble leveling layer, as well as the interface geotextile laying construction; through the position control cover and the limit The position vertical plate defines the filling position of the triangular abutment, and the hoisting and filling construction of the triangular abutment can be carried out by means of the abutment hoisting cage. The invention can effectively improve on-site construction efficiency and reduce construction difficulty.

Description

technical field [0001] The invention belongs to the technical field of dam body construction, and in particular relates to a prefabricated regular triangular prism dam and its construction method. Background technique [0002] In the construction process of gravity earth-rock dams, it often occurs that the dumping and filling bodies are washed away by the water body, which not only increases the amount of earthwork works, but also has adverse effects on the water environment. [0003] Compared with conventional earth-rock mixed dams, the triangular platform throwing dam has the advantages of resource saving and high construction efficiency. Although it has been successfully applied in some projects, it has always been an important aspect of engineering construction in the preparation of regular triangular platform blocks and oriented filling. At the same time, for the dam body project that requires high impermeability performance, how to realize the close fit between the tri...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E02B7/06
CPCE02B7/06
Inventor 冷凯刘丹何俊明朱川张利利
Owner 四川港航建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products