Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

41results about How to "Improve the efficiency of on-site construction" patented technology

Prefabricated cement-engraving simulated tree and construction technology thereof

PendingCN109043711AAdvantages of construction technologyAvoid pollutionArtificial flowers and garlandsWork in processEngineering
The invention provides a prefabricated cement-engraving simulated tree and a construction technology thereof. The prefabricated cement-engraving simulated tree comprises a base, a trunk, tree branchesand tree leaves; the trunk comprises an internal supporting steel structure and a trunk engraved veneer wrapping the exterior of the supporting steel structure, the supporting steel structure comprises a main supporting part and auxiliary supporting parts, inclined reinforcing ribs are arranged between the adjacent auxiliary supporting parts, a steel rib net and a steel wire net are sequentiallyarranged from inside to outside between the trunk engraved veneer and the supporting steel structure, and the main supporting part comprises two connecting plates and a main supporting rod between thetwo connecting plates; the tree branches comprise the branches connected with the connecting plates, and the outer surfaces of the branches are wrapped by tree branch engraved veneers; the tree leaves are connected to the tail ends of the tree branches. According to the prefabricated cement-engraving simulated tree and the construction technology thereof, dust pollution caused by on-site manufacturing is avoided, and the situation that during on-site manufacturing, semi-finished products are damaged.
Owner:LIUHEFENG TIANJIN TECH CO LTD

Movable multifunctional module thermal desorption system

The invention relates to a movable multifunctional module thermal desorption system. Equipment of the system is divided into three modules; the module I comprises a thermal desorption rotary kiln 1; the module II comprises a cyclone dust collector 2, a secondary combustion chamber 3, a heat exchanger 4, a spray cooling tower 5, an alkali absorption tower 7, an automatic control system 13 and a steam-water separator 14; the module III comprises a bag type dust collector 6, an activated carbon absorber 8, a biofilter 9, an induced draft fan 10, an exhaust device 11 and a booster fan 12; the equipment of the module I, the module II and the module III are respectively arranged on movable equipment. The system is suitable for four process routes including high-concentration and high-toxicity organic compound contaminated sites, general volatile/semi-volatile organic compound contaminated sites, acidic organic compound contaminated sites and organic sulfide and ammonia-nitrogen organic compound contaminated sites; different process routes and equipment can be accurately and effectively provided according to different organic compound contaminated sites, so that the time for designing a technical route is reduced, and the transportation and onsite loading and unloading are convenient.
Owner:中钢集团天澄环保科技股份有限公司

Inspection well in roadway and construction method

The invention provides an inspection well in a roadway and a construction method. A prefabricated wellbore connecting body is arranged on the upper part of a wellbore masonry body, elastic connectinglayers are arranged both on the upper surface and the lower surface of the prefabricated wellbore connecting body, an upper transverse supporting body and a lower transverse supporting body are used for providing vertical support to a built-in supporting plate; a particle filling body which is constrained by a wrapping reinforcement bag is arranged on the built-in supporting plate; a circumferential guide rail is arranged on a surface layer, the impact of cutting construction on the surrounding environment is reduced through an airtight vertical plate; an inner column pressure bearing rod anda pressure bearing rod end plate are arranged at the bottom end of an inner column of a hanging mold; an inner groove plate of a formwork is arranged on the inner side wall of a suspended inner mold,the space position of the suspended inner mold is limited by an inner supporting sliding plate and an inner supporting arc plate; and a steam curing cavity of a wellbore raising body is defined by a sealing bag at the bottom of the wellbore, a maintenance cover plate and the wellbore raising body. According to the inspection well in the roadway and the construction method, the difficulty of site construction can be reduced, the construction quality can be improved and the construction environment can be protected.
Owner:德达交通建设发展集团有限公司

Cast-in-place concrete shear wall formwork punching-free reinforcing system and construction method

The invention relates to the technical field of reinforcing of shear walls and retaining wall templates, in particular to a cast-in-place concrete shear wall template punching-free reinforcing systemand a construction method, and adopts the technical scheme that the cast-in-place concrete shear wall template punching-free reinforcing system comprises shear wall templates and reinforcing mechanisms. The reinforcing mechanism comprises an opposite-pull screw rod; the shear wall template is provided with base plates and opposite-pull screw rod mounting plates; the opposite-pull screw rod mounting plate is arranged between every two adjacent base plates; more than two through holes for the opposite-pull screw rods to penetrate through are sequentially formed in the opposite-pull screw rod mounting plate at intervals; the number of the shear wall formworks is two, and a gap is formed between the shear wall formworks. The opposite-pull screw rods penetrate through the opposite-pull screw rod mounting plates of the two shear wall templates. According to the technical scheme provided by the invention, the opposite-pull screw rod mounting plate is independently arranged and can be pre-machined, so that the procedure of forming holes in a template during on-site construction is omitted, and the on-site construction efficiency is improved.
Owner:THE FIRST CONSTR CO LTD OF CHINA CONSTR FIRST GRP +1

Internal mold fixing and external mold assembling type disassembly-free composite template and mounting method

The invention provides an internal mold fixing and external mold assembling type disassembly-free composite formwork and a mounting method, and belongs to the field of building materials. The composite formwork comprises an inner formwork, a heat preservation layer, a fireproof layer, a panel layer, an outer decorative surface decorative layer, secondary keels, main keels and diagonal braces; theheat preservation layer, the fireproof layer, the panel layer and the outer surface decorative layer are compounded; embedded screws are arranged in the heat preservation layer; the embedded screws are sequentially connected with the inner formwork, the secondary keels and the main keels through connecting pieces and bolt assemblies; the secondary keels are perpendicular to the main keels; the bolt assemblies are connected with the diagonal braces; and the diagonal braces are fixed to the base. The mounting method comprises the following steps: S1, the inner formwork is fixed through the secondary keels, the main keels and the diagonal braces; S2, the heat preservation layer, the fireproof layer, the panel layer and the outer surface decorative layer are assembled into an outer formwork; S3, the outer formwork is fixed to the inner formwork through the connecting pieces; and S4, steel bars are arranged between the inner formwork and the outer formwork, and concrete is poured. Comparedwith the prior art, modular production is adopted, all parts are in factory operation, the site construction efficiency is improved, the construction period is shortened, the labor cost is reduced, environmental pollution caused by site construction is reduced, and firmness and safety are higher.
Owner:孔祥利

Fully-prefabricated concrete-filled steel tube frame structure and assembling method

The invention provides a fully-prefabricated concrete-filled steel tube frame structure and an assembling method. The fully-prefabricated concrete-filled steel tube frame structure comprises stand columns, cross beams, first connecting pieces and second connecting pieces, wherein the stand columns comprise steel tubes and concrete in the steel tubes; prefabricated joints are arranged on the stand columns; cavities are formed in the end parts of the stand columns; connecting parts are arranged at the end parts of the cross beams; the first connecting pieces are arranged between the joints and the connecting parts and used for fixedly connecting the stand columns and the cross beams; the second connecting pieces are arranged between the two stand columns in the same vertical direction and are provided with ends corresponding to the cavities; and the two ends of each second connecting piece are correspondingly embedded into the cavities of the ends of the two stand columns, so that each second connecting piece is used for fixedly connecting each two stand columns in the same vertical direction. According to the fully-prefabricated concrete-filled steel tube frame structure and the assembling method provided by the invention, horizontal connection is achieved through the joints and the first connecting pieces, vertical connection is achieved through the second connecting pieces, and compared with on-site construction, the manufacturing quality and the stress performance of components are improved, construction is convenient, and the assembly efficiency is high, so that assembly type development of square steel tube concrete structures is easily promoted.
Owner:BEIJING UNIV OF CIVIL ENG & ARCHITECTURE

Support beam device for fixing boiler furnace water wall

The invention discloses a support beam device for fixing boiler furnace water walls. The support beam device for fixing the boiler furnace water walls is characterized in that the support beam devicecomprises a water wall tube; the water wall tube with the outer side affixed with a backing plate is connected by fins to form a square structure; a ribbed slab one with the outer side connected withfasteners is connected to the outer side of the backing plate; a base plate with the outer side connected with a panel through a connecting plate is disposed between the fasteners; an extension boardone is connected to both ends of the backing plate; the outer sides of adjacent extension boards are connected with a fixed plate; both ends of the connecting plate are connected with an extension board two which is hinged with a flat plate; the other end of the flat plate is hinged with the connecting plate; upper and lower sides of the backing plate are provided with support lugs; both ends of the support lugs are connected to the outer wall of the water wall tube; a pin shaft is inserted between the upper and lower support lugs. The support beam device for fixing the boiler furnace water walls has the advantages that a main structure of a support frame is welded in a boiler factory, and only welding of joints is required at the site with a little workload; accessories on the water wallare also completed in the factory, so that welding of the water wall at the site is avoided; assembly is convenient; good use effect is achieved.
Owner:GUIZHOU ELECTRIC POWER DESIGN INST

Fabricated door window and mounting method thereof

The invention provides a fabricated door window comprising a top embedded part, a bottom embedded part, standing columns and a unit window. The standing columns are arranged between the top embedded part and the bottom embedded part; the unit window is arranged between the two adjacent standing columns; the side frames of the unit window are plugged with the standing columns; the lower frame of the unit window is connected with the bottom embedded part; and the upper frame of the unit window is connected with the top embedded part. On the basis of the structure, the standing columns and the unit window are made in a factory, so that the quality of the finished products is high, the consumed materials are reduced, the economy is high, the construction period at the construction site is reduced, and the on-site construction efficiency is improved. Moreover, the integrality of assemblies like the unit window and the standing columns is enhanced; the fabricated door window is convenient totransport; and resource wasting is reduced. In addition, during the on-site mounting of the fabricated door window, splicing is mainly carried out and no scaffold needs to be built, so that the operation becomes convenient and rapid and the construction quality is controlled effectively. In addition, the invention also provides a mounting method of the fabricated door window. The method has advantages of simpleness, great convenience, and great easiness to promote and implement and the like.
Owner:GUANGZHOU ALUMINUM DECORATION ENG

Vibration aging method for lowering and homogenizing residual stress generated after turnout switch rail quenching

The invention discloses a vibration aging method for lowering and homogenizing residual stress generated after turnout switch rail quenching. The method includes the following steps that a finite element model of a turnout switch rail is established, and the quenching process is simulated according to the finite element model so as to obtain a turnout switch rail residual stress distribution cloudchart after quenching is completed; free mode analysis is carried out on the finite element model to determine the positions and corresponding natural vibration frequencies of three fixed supportingpoints; constraint mode analysis is carried out on the finite element model according to the fixed supporting points to determine the positions and corresponding inherent frequencies of excitation points; harmonic response analysis is carried out on the finite element model according to the fixed supporting points, the excitation points and the residual stress distribution cloud chart, and actualexcitation force and actual excitation frequency with the highest residual stress eliminating rate are obtained; and vibration is exerted on the turnout switch rail to treat residual stress. The method has the advantage of being capable of effectively lowering overall residual stress after quenching of the turnout switch rail.
Owner:HUBEI WUTIESHANQIAO TRACK EQUIP CO LTD +1

Construction method of assembling type building provided with hidden beams

The invention discloses a construction method of an assembling type building provided with hidden beams. In a factory, a foundation, wallboards provided with the hidden beams, stand columns, floorslabs and other parts are prefabricated; the foundation, the wallboards provided with the hidden beams, the stand columns, the floorslabs and other parts are transported to a construction site; on the construction site, the foundation installation is conducted; the wallboards provided with the hidden beams are assembled into assembling units and then hoisted or the wallboards provided with the hidden beams and the stand columns are assembled into assembling units and then hoisted, and the assembling units are assembled with other assembling units respectively and then installed on the foundation together; after the wallboards provided with the hidden beams and the stand columns in the same floor are assembled completely, cast-in-place is conducted on the joint between each hidden beam and the corresponding stand column; after cast-in-place concrete is settled, the floorslabs are hoisted and fixed to the hidden beams. According to the construction method of the assembling type building provided with the hidden beams, the hidden beams are arranged in wallboard frame board components, the prefabricated degree of the wallboards is improved, the on-site construction steps of the building are reduced, the on-site construction efficiency of the construction site is improved, and the construction pollution of the construction site is reduced.
Owner:HUAIYIN INSTITUTE OF TECHNOLOGY

A kind of marine low-temperature storage tank covered with thermal insulation material and construction method thereof

The invention relates to a low-temperature storage tank coated heat insulation material used for a boat, and relates to the field of production of low-temperature pressure vessels used for the boat. The low-temperature storage tank coated heat insulation material used for the boat comprises a drum body and end sockets. The two ends of the drum body are both provided with a circle of steel nails and are coated with multiple layers of bedding. Each layer comprises end bedding and middle bedding. The front edge of the first end bedding penetrates through the steel nails at the front end of the drum body, and the front edge of the middle bedding presses the rear edge of the previous end bedding. The front edge of the second end bedding presses the rear edge of the middle bedding, and the rear edge of the second end bedding penetrates through the steel nails at the rear end of the drum body. The center of each steel nail is provided with steel nails and is coated with multiple layers of bedding. Each layer of bedding comprises two end bedding, and the two end bedding are in a sector shape, wherein the inner arc sides are fixed to the steel nails at the centers of the bedding, and the outer arc sides are fixed to the steel nails which are close to one end of the drum body. Two straight sides of one end socket bedding are coated on the two straight sides of another end socket bedding. The splicing positions of different layers of bedding are staggered, and the bedding at the outermost layer is coated with a layer of glass wool cloth. The low-temperature storage tank coated heat insulation material used for the boat has the advantages that the construction efficiency is improved, the use ratio of raw materials is improved, and the low-temperature usability of a finished product is improved.
Owner:HEAVY EQUIP ENG CO LTD OF WUCHANG SHIPBUILDING IND

Prefabricated regular triangular prism dam building and its construction method

The invention relates to a prefabricated regular triangular prism dam and a construction method. An integral formwork is used to prepare the regular triangular prism, and a bottom form connecting hole is arranged on the integral bottom form; it can be controlled by the inner guide groove pipe and the outer guide groove pipe The filling position of the sand bag at the bottom of the dam is limited by the lateral position control plate, and the sand bag of the dam body is compacted by the compaction control body and the transverse compression plate; the sliding plate of the position control body can be synchronized Drive the fabric rotating shaft, slope scraping plate and sand filling tank pipe to move along the rolling pavement slide rail, and can simultaneously complete the filling and scraping of the sand and pebble leveling layer, as well as the interface geotextile laying construction; through the position control cover and the limit The position vertical plate defines the filling position of the triangular abutment, and the hoisting and filling construction of the triangular abutment can be carried out by means of the abutment hoisting cage. The invention can effectively improve on-site construction efficiency and reduce construction difficulty.
Owner:四川港航建设工程有限公司

Heat exchange system of multi-connected air conditioner and air conditioner

The present invention proposes a heat exchange system of a multi-connected air conditioner and the air conditioner, wherein the heat exchange system of the multi-connected air conditioner includes an outdoor unit component and an indoor unit component, the indoor unit component includes a fan coil unit, and the fan coil unit has a water inlet There are multiple fan coil units connected in parallel; the outdoor unit components include water inlet pipes and water outlet pipes, and the water inlet pipes are connected to the water outlets of the fan coil units so as to input the water output from the fan coil units. to the inside of the outdoor unit for heat exchange, and the outlet pipe is connected to the water inlet of the fan coil unit to transport the water after heat exchange of the outdoor unit to the inside of the fan coil unit; the indoor unit component also includes a wire controller, and the outdoor unit component also includes a It includes a control unit, which is connected with the wire controller, so as to transmit the parameters for controlling the operation of the fan coil unit to the wire controller; the air conditioner includes the heat exchange system of the above-mentioned multi-connected air conditioner. The invention can shorten the product development period and reduce the cost.
Owner:QINGDAO HISENSE HITACHI AIR CONDITIONING SYST

Accessible roof construction method

The invention relates to an accessible roof construction method. The accessible roof construction method comprises the following steps that S1, materials are prepared, wherein wood formworks and reinforcing steel bars are prepared, and the wood formworks with proper sizes are selected as a roof bottom formwork, a roof side formwork, a hole opening side formwork, an additional side formwork and a staircase formwork; S2, structure construction is carried out, wherein the roof bottom formwork and the roof side formwork are supported, the hole opening side formwork is taken to be supported on the periphery of a stair hole opening, and the roof bottom formwork, the roof side formwork and the hole opening side formwork jointly form a roof pouring area, reinforcing steel bars are bound in the roof pouring area, the additional side formwork is supported on the side, away from the stair hole opening, of the hole opening side formwork, a beam pouring area is formed between the hole opening side formwork and the additional side formwork, concrete is poured in the roof pouring area and the beam pouring area, a roof panel and an inserting beam are formed after the concrete is solidified, the staircase formwork is supported, concrete pouring is conducted, and a staircase structure is formed after the concrete is solidified; and S3, staircase installation is carried out, and specifically, the staircase structure is lifted and is enabled to be arranged outside the inserting beam in a sleeving mode. The construction method has the effect of improving the construction efficiency.
Owner:ZHEJIANG HONGCHAO CONSTR GRP CO LTD

Light-gauge steel joist partition wall with stone-plastic wallboards

The invention discloses a light-gauge steel joist partition wall with stone-plastic wallboards. The light-gauge steel joist partition wall with the stone-plastic wallboards comprises a top joist and aground joist, a plurality of communicating type vertical joists are uniformly arranged between the top joist and the ground joist, acoustic bridge cutoff vertical joist groups are arranged between the adjacent communicating type vertical joists, the outer sides of the acoustic bridge cutoff vertical joist groups are provided with the pore-type stone-plastic wallboards, and the pore-type stone-plastic wallboards are connected with the communicating type vertical joists. According to the light-gauge steel joist partition wall with the stone-plastic wallboards, a light-gauge steel joist structure with single-sided vertical joists and groove type vertical joists alternately arranged is adopted, so that the whole weight of the partition wall is effectively reduced, the sound insulation performance and the overall rigidity of the partition wall are improved, the structure is simple, and the effect is excellent; the pore-type stone-plastic wallboards are connected in a mutual inserting mode, so that the structure is compact, the situation that a function plate layer or a decorative plate layer is additionally adopted for covering is avoided, the cost is saved, and the construction is convenient and fast; and the stone-plastic wallboards are integrated with a film coating structure, so that the overall performances of moisture-proofing, fire-proofing, sound insulation and the like ofthe partition wall are improved, and the field construction efficiency is improved.
Owner:ZHEJIANG YASHA DECORATION

Combined aluminum-clad steel curtain wall system

The invention discloses a combined aluminum-clad steel curtain wall system. The system is characterized in that an aluminum-clad steel stand column comprises an outer-clad aluminum column and a liningsteel column, the outer-clad aluminum column comprises a left corner frame and a right corner frame, and the left side, the right side and the upper side of the lining steel column are clad through the left corner frame and the right corner frame; and a first inward bent part and a second inward bent part are arranged at the upper intersection between the left corner frame and the right corner frame respectively, and mounting and positioning of the left corner frame and the right corner frame are achieved through nesting fit of the first bent part and the second bent part, so that the left corner frame, the right corner frame and the lining steel column are fixed by penetrating through the first bent part, the second bent part and a first screw of the upper wall face of the lining steel column. According to the system, an outer-sleeve aluminum profile is designed into a combination of several opening profiles, the requirement for the precision of matching between the aluminum profileand steel is greatly lowered, the site construction efficiency is effectively improved, a rear opening of the profile is sealed through a cover plate, installation is convenient, and the appearance iselegant.
Owner:无锡金城幕墙装饰工程有限公司

Vibration Aging Method for Reducing and Homogenizing the Residual Stress of Quenched Switch Point Rail

The invention discloses a vibration aging method for lowering and homogenizing residual stress generated after turnout switch rail quenching. The method includes the following steps that a finite element model of a turnout switch rail is established, and the quenching process is simulated according to the finite element model so as to obtain a turnout switch rail residual stress distribution cloudchart after quenching is completed; free mode analysis is carried out on the finite element model to determine the positions and corresponding natural vibration frequencies of three fixed supportingpoints; constraint mode analysis is carried out on the finite element model according to the fixed supporting points to determine the positions and corresponding inherent frequencies of excitation points; harmonic response analysis is carried out on the finite element model according to the fixed supporting points, the excitation points and the residual stress distribution cloud chart, and actualexcitation force and actual excitation frequency with the highest residual stress eliminating rate are obtained; and vibration is exerted on the turnout switch rail to treat residual stress. The method has the advantage of being capable of effectively lowering overall residual stress after quenching of the turnout switch rail.
Owner:HUBEI WUTIESHANQIAO TRACK EQUIP CO LTD +1

Closely-spliced one-way laminated slab free of bar extending out of plate end and construction method of closely-spliced one-way laminated slab

The invention relates to a closely-spliced one-way laminated slab free of a bar extending out of the plate end. The closely-spliced one-way laminated slab comprises a prefabricated bottom layer and acast-in-place surface layer located on the prefabricated bottom layer. The prefabricated bottom layer is formed by splicing a plurality of concrete prefabricated plates; the concrete prefabricated plates are provided with a plurality of steel bar hole channels; the steel bar hole channels between the adjacent concrete prefabricated plates are butted together to form steel bar via holes; and bottomstressed steel bars are arranged in the steel bar via holes in a penetrating mode, a plurality of grouting holes communicating with the steel bar hole channels are formed in the concrete prefabricated plates, the steel bar via holes are filled with transverse filling fixing strips formed by solidifying cement mortar, and the filling fixing strips extend into the grouting holes to form vertical fixing strips. According to a closely-spliced one-way laminated slab bottom plate free of the bar extending out of the plate end, bottom plate steel bars are continuous, the bar extending out of the plate end and post-cast strips do not exist, and the problems that according to an existing spliced laminated slab bottom plate, a bar extends out of the plate end, bottom steel bars are discontinuous, and post-cast strips exist are solved.
Owner:SHAOXING UNIVERSITY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products