Bent steel bar shearing device for building construction
A technology for bending steel bars and shearing devices, applied in the field of bending steel bar shearing devices, can solve problems such as worker injury, random rolling of steel bars, inability to fix steel bars, etc., and achieves the effect of convenient operation, prevention of falling and rolling at will, and small size
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0021] A bending steel bar shearing device for building construction, such as Figure 1-3 As shown, it includes a mounting frame 1, a handle 2, a guide assembly and a shearing assembly. The upper part of the mounting frame 1 is fixed with the handle 2 through bolts, the lower part of the mounting frame 1 is provided with a guiding assembly, and the lower part of the mounting frame 1 is provided with a shearing assembly.
[0022] When using the device to cut the bent steel bar, first put the device on the ground, then place the bent steel bar on the inside of the guide assembly, the direction of the part to be cut is upward, and then the worker holds the handle 2 Press down to drive the mounting frame 1 to move downward, thereby driving the shearing assembly to move downward. The guide assembly can ensure that the mounting frame 1 and the shearing assembly move vertically downward, and the bending assembly will bend during the vertical downward movement. The steel bar is cut, a...
Embodiment 2
[0028] On the basis of Example 1, such as Figure 4 and 5 As shown, it also includes a second slide rail 14, a third slide block 15, a third spring 16, a U-shaped bar 17 and a splint 18, and the middle part of the installation frame 1 is symmetrically connected with the second slide rail 14 by bolts front and back. In the two slide rails 14, the third slide block 15 is arranged symmetrically on the left and right, and the third spring 16 is connected between the third slide block 15 and the second slide rail 14, and the third slide block 15 is fixed by bolts. A U-shaped bar 17 is connected, and the U-shaped bar 17 is slidably matched with the second slide rail 14, and splints 18 are fixedly connected between the U-shaped bars 17 on the left and right sides by bolts.
[0029] Before placing the bent steel bar, the U-shaped bar 17 can be pulled to the left and right sides, so that the splint 18 is far away from the third slider 15. At this time, the third spring 16 is compresse...