River and lake water system comprehensive cooperative scheduling system and scheduling method thereof

A collaborative dispatching and joint dispatching technology, applied in general water supply conservation, instrumentation, data processing applications, etc., can solve problems such as huge computational cost, complex joint dispatching optimization solution process, and many constraints.

Active Publication Date: 2020-11-20
NANJING HYDRAULIC RES INST
View PDF6 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] There are many water conservancy projects in some river basins, and there is a complex nonlinear relationship between project scheduling and water level, water quantity, and water quality indicators in the area, and there are many scheduling requirements and constraints, so the joint scheduling optimization solution process is complex and has many constraints. The unstructured features of the watershed, such as directly using the optimization algorithm to drive the joint water quantity-water quality dispatching model to solve, not only has a huge computational cost, but also may not be able to obtain ideal solution results

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • River and lake water system comprehensive cooperative scheduling system and scheduling method thereof
  • River and lake water system comprehensive cooperative scheduling system and scheduling method thereof
  • River and lake water system comprehensive cooperative scheduling system and scheduling method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0117] In the following description, numerous specific details are given in order to provide a more thorough understanding of the present invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without one or more of these details. In other examples, some technical features known in the art are not described in order to avoid confusion with the present invention.

[0118] The present invention relates to a comprehensive cooperative dispatching system of rivers and lakes. The overall architecture design is mainly composed of the early warning support server of the B / S architecture, including the digital and analog call layer, the decision-making calculation layer, and the system management layer. See figure 1 .

[0119] The digital-analog calling layer is used to collect water body data, and construct the water body data into a joint scheduling model; the decision-making calculation layer is used to couple the data of the ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a river and lake water system comprehensive cooperative scheduling system and a scheduling method thereof, which adopt a mode of combined solution of a drainage basin water quantity and quality mathematical model and a water resource multi-target cooperative combined scheduling model to perform decision optimization of a drainage basin combined scheduling scheme. The TaihuLake basin water resource joint scheduling decision-making system capable of guaranteeing water safety is formed by constructing a basin water resource multi-target cooperative joint scheduling model, expanding and perfecting scheduling target management, scheduling scheme analysis and other functions on the basis of an existing basin river network water quantity and quality mathematical model, developing an optimization decision-making module and a corresponding interface and coupling the optimization decision-making module and the corresponding interface. A scheduling scheme set satisfyingmultiple goals of a drainage basin and a region is proposed; different scheduling scheme sets are simulated by a drainage basin water quantity and water quality mathematical model, a water quantity and water quality simulation result is used as input of a water resource joint scheduling decision, and optimal decision of a drainage basin water resource multi-target cooperative joint scheduling scheme is realized through calculation and evaluation of a joint scheduling decision model.

Description

technical field [0001] The invention relates to the field of water network system monitoring, in particular to a comprehensive coordinated dispatching system of rivers and lakes and a dispatching method thereof. Background technique [0002] There are many water conservancy projects in some river basins, and there is a complex nonlinear relationship between project scheduling and water level, water quantity, and water quality indicators in the area, and there are many scheduling requirements and constraints, so the joint scheduling optimization solution process is complex and has many constraints. The unstructured features of the watershed, such as directly using the optimization algorithm to drive the joint water quantity-water quality dispatching model to solve, not only has a huge computational cost, but also may not be able to obtain ideal solution results. [0003] For this reason, how to design a collaborative scheduling system, construct a mathematical model through t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06Q50/26G16Y10/35G16Y20/30G16Y30/00
CPCG06Q10/04G06Q10/0631G06Q10/0635G06Q10/067G06Q50/06G06Q50/26G16Y10/35G16Y20/30G16Y30/00Y02A20/152
Inventor 戴江玉吴时强吴修锋张宇王芳芳高昂黄渝桂段蕾薛万云贾本有王小东杨倩倩赵宇航杨蕊杨帆
Owner NANJING HYDRAULIC RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products