Cascade hydropower station aggregation dimension reduction compensation benefit distribution method based on cooperative game and comprehensive weighting
A technology of cooperative game and comprehensive empowerment, which can be used in instruments, complex mathematical operations, data processing applications, etc., and can solve problems such as low computing efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0047] The present invention will be further described in detail below in conjunction with the accompanying drawings and examples. The following examples are explanations of the present invention and the present invention is not limited to the following examples.
[0048] Example.
[0049] figure 1 The topological structure of cascaded hydropower stations in a basin is shown. There are 10 hydropower stations from A to J in the basin. Among them, hydropower stations A to G are operated by development entity I, and hydropower stations H to J are operated by development entity II. The regulation performance of each hydropower station is shown in the legend. If calculated directly based on cooperative game theory, then the number of combinations of all cooperative forms is That is, it is necessary to build and solve 1023 cascade scheduling models, which is very inefficient. According to the present invention, the number of power stations is coupled and dimensionally reduced, an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com