A semi-grouting sleeve assembly and its installation method
A technology of semi-grouting sleeve and installation method, which is applied in the processing of building components, building reinforcements, building materials, etc., can solve the problem that the overall application cost of prefabricated buildings increases, affects the safety performance of prefabricated building structures, and the quality of grouting is not good. It is easy to guarantee and other problems to achieve the effect of reducing application cost, improving construction quality and facilitating alignment
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0077] see Figure 1 to Figure 8 , Embodiment 1 of a half-grouting sleeve assembly of the present invention, the half-grouting sleeve assembly includes:
[0078] A first steel bar 1, the first steel bar 1 has a first external thread 11;
[0079] The second steel bar 2, the second steel bar 2 has a first tensile part 21;
[0080] A first sleeve 3, the first sleeve 3 has a first internal thread 31;
[0081] Connecting sleeve 4, described connecting sleeve 4 comprises small-diameter section 41 and large-diameter section 42, described small-diameter section 41 has second external thread 411, and described large-diameter section 42 has third external thread 421, and described large-diameter The end of the section 42 away from the small-diameter section 41 is also provided with a steel bar receiving groove 422 for the second steel bar 2 to move radially in, and the side wall of the steel bar receiving groove 422 is provided with a second tensile part 423;
[0082] The second slee...
Embodiment 2
[0116] The difference between the second embodiment of the installation method of the half-grouting sleeve assembly and the first embodiment of the installation method of the half-grouting sleeve assembly lies in that the second steel bar 2 of the half-grouting sleeve assembly is different. The second steel bar 2 in the present embodiment is Figure 10 to Figure 12 As shown, the rest of the structure is the same as that of the half-grouting sleeve assembly in Embodiment 1 of the installation method.
[0117] In this embodiment, the installation method includes the following steps:
[0118] S1. Completely thread the transition sleeve 2A and the third steel bar 2B, rotate the first sleeve 3 so that the first sleeve 3 is completely set on the small diameter section 41 of the connecting sleeve 4, rotate the second sleeve 5 to make the first The end of the second sleeve 5 away from the first steel bar 1 does not block the steel bar receiving groove 422 of the connecting sleeve 4; ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 