Calibration table body for full-inspection receiving test of high-voltage transformer

A technology of high-voltage transformers and transformers, which is applied in the direction of high resistance measurement, instruments, and measuring devices, can solve the problems of increasing equipment purchase costs and labor costs, uneven levels of testing personnel, and low testing efficiency. Reduce the repeated purchase rate of equipment, improve the equipment reuse rate, and the effect of high equipment reuse rate

Pending Publication Date: 2020-12-08
WUHAN NARI LIABILITY OF STATE GRID ELECTRIC POWER RES INST
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At present, the verification methods of high-voltage transformers are mostly manual verification, the verification efficiency is low, the management and control methods are backward, and the learning cost of the verification personnel is high, and a safe and effective centralized integrated control scheme has not been formed.
[0003] In the current industry, the high-voltage transformer verification devices generally have problems such as single function, separate sets of various test items, and incomplete equipment configuration functions, resulting in many high-voltage transformer verification institutions not having complete high-voltage transformer inspection and verification capabilities.
During the test, it is necessary to carry out manual handling between different testing equipment, which will inevitably increase equipment purchase costs and labor costs
At the same time, switching between different tests requires manual disconnection of the wiring repeatedly, which will inevitably increase the test error rate caused by wiring deviation while the verification efficiency is low.
In addition, due to manual operation, the learning cost of manually learning the verification operation specification is relatively high. It is necessary to learn two kinds of transformers, 10 kinds of tests and up to 15 times of wiring methods.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Calibration table body for full-inspection receiving test of high-voltage transformer
  • Calibration table body for full-inspection receiving test of high-voltage transformer
  • Calibration table body for full-inspection receiving test of high-voltage transformer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0025] like Figure 1-4 As shown in the figure, the present invention provides a technical solution: a verification table body for the full inspection and acceptance test of high-voltage transformers, including an aluminum profile frame 1 and a transformer verification station body 2, and the transformer verification station body 2 is composed of The transformer conveying unit 21, the withstand voltage test station 22, the voltage tra...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a calibration table body for a full-inspection receiving test of a high-voltage transformer, and the calibration table body comprises an aluminum profile frame and a transformer calibration station body. A mutual inductor verification station body is composed of a mutual inductor conveying unit, a withstand voltage test station, a voltage transformer induction withstand voltage and error test station, a current error test station and a functional module, and the mutual inductor verification station body is installed below an aluminum profile frame. The calibration tablebody is compatible with various mutual inductors, and manufacturers are different due to different transformation ratios of different mutual inductors. The appearance sizes of the mutual inductors are various, the table body can carry out adaptive wiring on the mutual inductors according to the mutual inductors with different sizes, so that the calibration requirements of the different mutual inductors are met, multiple test items can be carried out, the device can carry out all items of full-inspection test calibration on the high-voltage voltage and current mutual inductors after arrival ofgoods, and the mutual inductor calibration efficiency is high. The calibration table body is suitable for calibrating the high-voltage transformer.

Description

technical field [0001] The invention relates to the technical field of verification of electric power measuring instruments, in particular to a verification table body used for a full inspection and acceptance test of a high-voltage transformer. Background technique [0002] The demand for high-voltage transformers increases with the further expansion of the market, and the verification capability of high-voltage transformers is facing increasing pressure. At present, the verification methods of high-voltage transformers are mostly manual verification, which has low verification efficiency, backward management and control methods, and high learning costs for verification personnel. A safe and effective centralized integrated control scheme has not been formed. [0003] In the current stage of the industry, high-voltage transformer verification devices generally have problems such as single function, complete sets of various test items, and incomplete equipment configuration ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01R31/01G01R27/02G01R33/12G01R35/02
CPCG01R27/025G01R31/01G01R33/1253G01R35/02
Inventor 孔凡胜陈新波王曼涂志威方璟余炼松朱昌林万家乐胡欢邵帅龚少平
Owner WUHAN NARI LIABILITY OF STATE GRID ELECTRIC POWER RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products