Hydroelectric engineering monitoring data drawing system and method
A hydropower project and monitoring data technology, applied in the field of hydropower project monitoring data drawing system, can solve the problems of heavy workload, poor user experience, large amount of data, etc., and achieve the effect of improving efficiency, improving efficiency and management level
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] The present application is described in detail below in conjunction with the examples, but the present application is not limited to these examples.
[0065] see figure 1 , the hydropower project monitoring data drawing system provided by this application includes:
[0066] The data collection module 10 is used to collect the data of the area to be monitored in the hydropower project, and is electrically connected to the safety monitoring data storage module 20;
[0067] The safety monitoring data storage module 20 is used to store the data obtained in the data acquisition module 10, and builds a safety monitoring database; the safety monitoring data storage module 20 is respectively connected with the visualization scene object editing module 30 and the data acquisition module 10 for data storage. and records; the safety monitoring data storage module 20 also stores information such as the actual background map of the engineering site, the safety monitoring background...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


