Intelligent building and fire-fighting power electromechanical equipment installation method thereof

An installation method and electric power technology, applied in the direction of electric fire alarms, measuring devices, and fire alarms relying on the effect of smoke/gas, can solve problems such as affecting the construction progress and quality, and difficulty in finding installation problems in time. Achieve the effect of reducing losses, reducing site losses, and powerful monitoring functions

Inactive Publication Date: 2021-01-05
广州华安消防有限公司
View PDF15 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] In view of the above-mentioned related technologies, the inventor believes that there are defects in the existing fire-fighting power electromechanical installation that mainly rely on manual quality monitoring, which makes it difficult to find installation problems in time and affects the construction progress and quality

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Intelligent building and fire-fighting power electromechanical equipment installation method thereof
  • Intelligent building and fire-fighting power electromechanical equipment installation method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0068] The installation method of the intelligent building includes installing the prefabricated PC wallboard on the main structure as a non-load-bearing structure after completing the construction of the main structure of the building;

[0069] Specifically, after the construction of the main structure of the house is completed, the prefabricated PC wall panels are installed on the main structure as a non-load-bearing structure. Among them, the main structure can be steel structure, cast-in-place concrete structure or prefabricated concrete structure. The connection components between the PC wallboard and the main structure adopt a mechanical connection method including bolts and embedded parts. Carry out caulking treatment or glue sealing treatment at the exposed joints of the connecting components to fill the gaps and improve the waterproof, fireproof and sound insulation performance of the house.

[0070] The implementation principle of Embodiment 1 is: after completing t...

Embodiment 2

[0072] The installation method of the intelligent building includes installing the prefabricated PC wall panels in place while the main structure of the building is being constructed;

[0073] Specifically, during the construction of the main body of the building, the PC wall panels are first installed in place. The PC wall panels can be non-load-bearing walls, load-bearing walls, or even earthquake-resistant shear walls. Among them, the main structure can be steel structure, cast-in-place concrete structure or prefabricated concrete structure. The connecting member between the PC wall panel and the main structure can be cast-in-place concrete or prefabricated composite concrete structure. Therefore, the structure of the seamless connection between the connecting components greatly reduces the difficulty of component production and on-site construction, is easier to market, and also enhances the waterproof and sound insulation performance of the house.

[0074] The implementa...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to an intelligent building and a fire-fighting power electromechanical equipment installation method thereof. The installation method comprises the steps that while the fire-fighting power electromechanical equipment is installed, information of a construction site is collected in real time and transmitted to a monitoring background; the monitoring background receives the returned construction site information and automatically identifies the construction site information according to the construction specification requirements of the project and the construction key of each process; and when the construction site information does not meet the construction specification requirements of project or the key of process construction, the monitoring background gives out alarm sound. The method has the effects of timely discovering the installation problem of the fire-fighting power electromechanical equipment and ensuring the construction progress and quality.

Description

technical field [0001] This application relates to the technical field of building control, in particular to an intelligent building and an installation method of its fire-fighting electric motor. Background technique [0002] With the development of the times and the continuous improvement of information technology, intelligent building technology is developing rapidly. Intelligent buildings generally divide all equipment into modules according to their functions, and install various equipment in preset positions in the building according to design requirements and module divisions, so that the electricity, air conditioning, lighting, disaster prevention, anti-theft, The coordination work of transportation equipment has realized building automation, communication automation, office automation, security automation, and fire protection automation, plus structured integrated wiring, structured integrated network, and intelligent building integrated information management autom...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G08B17/06G08B17/10G08B25/00G01D21/02
CPCG01D21/02G08B17/06G08B17/10G08B25/00
Inventor 陈皓贤陈志伟陈文
Owner 广州华安消防有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Eureka Blog
Learn More
PatSnap group products