Comprehensive pipe gallery full-cycle construction management system based on BIM

A technology of integrated pipe gallery and management system, applied in the field of BIM-based full-cycle construction management system of integrated pipe gallery, can solve problems such as hazards to the safety of life and property of construction workers, disputes over completion acceptance and settlement, chain reaction errors, etc., so as to reduce underground operations. Risk, ease of operation management, avoid the effect of major changes

Pending Publication Date: 2021-01-15
ZHEJIANG ELECTRIC POWER DESIGN INST
View PDF0 Cites 7 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This type of project has the characteristics of complexity, huge investment, and long construction period. At present, the main problems are: (1) Design management: this type of project requires multi-disciplinary cooperation, and mutual funding confirmation between different majors. In one step, it may cause design changes. Not only that, in the construction process, there may also be pipeline adjustments that lead to chain reaction errors, which will bring higher design and construction costs; (2) Construction management: quality, progress, cost and Personnel health and safety management is the basis for the successful completion of each proje...

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Comprehensive pipe gallery full-cycle construction management system based on BIM
  • Comprehensive pipe gallery full-cycle construction management system based on BIM
  • Comprehensive pipe gallery full-cycle construction management system based on BIM

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] In order to make those skilled in the art more clearly understand the purpose, technical solutions and advantages of the present invention, the present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0022] In describing the present invention, it should be understood that the orientations indicated by terms such as "upper", "lower", "left", "right", "inner", "outer", "transverse", "vertical" etc. Or the positional relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention, and does not indicate or imply that the referred device or element must have a specific orientation, so it should not be construed as a limitation of the present invention.

[0023] Such as Figure 1-7 As shown, a BIM-based comprehensive utility gallery full-cycle construction management system described in the present invention, the system is...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a comprehensive pipe gallery full-cycle construction management system based on BIM, the system is divided into four modules according to different stages of a comprehensive pipe gallery project, and the first module is a decision stage module; the module II is a construction drawing design stage module; the module III is a construction stage module; the module IV is a completion stage module; the first module is mainly used for engineering feasibility research, initial setting and bidding and tendering stages and comprises a first design technology platform and an early-stage data platform. The module II is mainly used for an engineering design construction drawing stage and comprises a second design technology platform and a design data platform; the module III ismainly used for construction stages of engineering modes such as EPC and whole-process consultation, and comprises a construction technology platform, a construction management platform and a construction data platform; the module IV is mainly used for completion stages of engineering modes such as EPC and whole-process consultation. The module comprises a completion technology platform, a data management platform and a project transfer platform. The system has the characteristics of effectively improving the management level, reducing the construction cost and the like.

Description

technical field [0001] The invention relates to the field of comprehensive utility gallery construction, in particular to a BIM-based comprehensive utility gallery full-cycle construction management system. Background technique [0002] The investment cost of the comprehensive pipe gallery is high, and 50 years of development and capacity expansion space are reserved according to the planning requirements, so that one investment can achieve long-term effective use. This type of project has the characteristics of complexity, huge investment, and long construction period. At present, the main problems are: (1) Design management: this type of project requires the cooperation of multiple disciplines, and mutual funding confirmation between different disciplines. In one step, it may cause design changes. Not only that, in the construction process, there may also be pipeline adjustments that lead to chain reaction errors, which will bring higher design and construction costs; (2) ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/06G06Q50/08
Inventor 林立章政海毛婕陈艳方显业叶沁园张谦陈北海代雷雷曹孟超
Owner ZHEJIANG ELECTRIC POWER DESIGN INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products