A construction method for segmental hoisting of steel grid structure

A segmented hoisting and construction method technology, which is applied in building construction, building material processing, construction, etc., can solve the problems of large number of temporary projects, inconvenient construction operations, and impact on construction progress, so as to reduce the time for high-altitude operations and improve Assembling efficiency, improving the effect of assembling quality

Active Publication Date: 2022-05-17
中铁二十局集团市政工程有限公司
View PDF18 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The overall assembled hanger method generally has site restrictions, and the site needs to have the conditions for supporting large-scale truck cranes
The high-altitude loose assembly method is generally artificial high-altitude assembly, which is inconvenient for construction operations. It is difficult to control the angle of the rods and the tightening degree of bolts, and it is prone to quality problems and difficult to rectify. Large; the construction efficiency of high-altitude operations is low, and the construction progress is affected; temporary scaffolding and operating platforms need to be erected, the number of temporary projects is large, and the economy is not high; high-altitude operations are easily affected by rainfall, strong winds and high temperature weather, and there are many influencing factors

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A construction method for segmental hoisting of steel grid structure
  • A construction method for segmental hoisting of steel grid structure
  • A construction method for segmental hoisting of steel grid structure

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] Such as Figure 1 to Figure 4 Shown is a segmental hoisting construction method of a steel grid structure, the steel grid structure to be hoisted includes a lower grid and an upper grid arranged above the lower grid, and the lower grid and the upper grid are parallel to each other , the lower grid and the upper grid are single-layer grid structures assembled from a plurality of rectangular unit grids, and each of the rectangular unit grids is assembled from four string balls and string rods. The string ball in the grid frame is the lower string ball 1, the string bar in the lower layer grid frame is the lower string bar 2, the string ball in the upper layer grid frame is the upper string ball 3, and the string bar in the upper layer grid frame is the upper string bar 5. An upper string ball 3 is arranged directly above each rectangular unit grid in the grid, and each upper string ball 3 is connected with four lower string balls 1 in the rectangular unit grid directly be...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a segmental hoisting construction method for a steel grid structure. The steel grid structure to be hoisted includes a lower grid frame and an upper grid frame, both of which are assembled by four string balls and string rods. The lower network frame and the upper network frame are connected through web bars, and the method includes the following steps: 1. Construction preparation; 2. Segmentation of the steel grid structure; 3. Assembly of steel grid segments; Temporary support for segmental hoisting; 5. Segmental hoisting of steel grid structure. The construction operation of the present invention is convenient. By dividing the steel grid structure into multiple steel grid segments, assembling the steel grid segments on the ground, and hoisting the assembled steel grid segments one by one, it can effectively Improve the assembly quality and assembly efficiency of the steel grid sections; temporary supports are used for temporary support during the hoisting of the steel grid sections, which can effectively ensure the installation accuracy of the steel grid sections and reduce the height of the steel grid structure during hoisting The working time is small and the safety risk is small.

Description

technical field [0001] The invention belongs to the technical field of steel grid hoisting, and in particular relates to a segmental hoisting construction method of a steel grid structure. Background technique [0002] As a lightweight, prefabricated, energy-saving and environmentally-friendly building structure, the steel grid structure has the advantages of good processing quality, excellent structural size, and fast construction speed. The construction of the structure generally adopts the integral assembly hanger method and the high-altitude loose assembly method. The overall assembled hanger method generally has site restrictions, and the site needs to have the conditions for supporting large-scale truck cranes. The high-altitude loose assembly method is generally artificial high-altitude assembly, which is inconvenient for construction operations. It is difficult to control the angle of the rods and the tightening degree of bolts, and it is prone to quality problems a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E04B1/35E04G21/14E04G21/16
CPCE04B1/3511E04G21/142E04G21/162
Inventor 任猛喻晶高常海王领樊恒东马小卫李瑞山冯文玮张志宏李伟亮宋亚辉
Owner 中铁二十局集团市政工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products