Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

298results about How to "Does not affect construction" patented technology

Heating wire heating device and construction method for winter concrete

The invention discloses a heating wire heating device and a construction method for winter concrete. The construction method comprises the following steps of: calculating and determining the total power of adopted heating wires according to physical parameters of concrete members, templates and a heat insulating material, and environmental temperature; determining a heating wire arrangement diagram according to a calculated result; determining a scheme for connecting a power line and the heating wires; pouring concrete, and laying plastic cloth isolating layers on the concrete members; arranging the heating wires on the plastic cloth isolating layers, and immediately covering heat insulating layers on the heating wires; and measuring temperature continuously for three days every 2 hours, and controlling the temperature of the concrete members to be between 10 and 20 DEG C by controlling the on/off of the heating wires. The power supply heating construction method is adopted, the temperature requirement due to strength increase of the winter concrete is met, the constraint of construction conditions and the difficulty of the conventional construction method are avoided, the construction is simple, the operation is convenient and the construction cost is saved. The invention is suitable for winter concrete construction.
Owner:CHINA CONSTR SECOND ENG BUREAU LTD +1

Mechanical connection type anchor rod

The invention discloses a reinforced bar anchor rod with a mechanical connection type reusable anchor rod body, which is used in the field of geotechnical engineering. The reinforced bar anchor rod is invented in order to realize the following three purposes: (1). after the anchor rod is not in use, the anchor rod body can be removed so as to be recycled, thereby the engineering cost is reduced; (2) the residues of reinforced bars do not exist outside a building restriction line so that the construction of adjacent unbuilt structures is not affected; and (3) resources are saved, and the energy conservation and emission reduction is facilitated. The reinforced bar anchor rod with the mechanical connection type reusable rod body comprises a reinforced bar anchor rod body, a pressure-bearing plate, a (connecting) nut, a supporting frame, an anti-bonding casing pipe, an anchor backing plate, a (locking) nut and the like. The principle of the reinforced bar anchor rod with the mechanical connection type reusable rod body is as follows: according to the positive and negative screw connecting mechanism of a thread, the anchor rod body is connected through a right-hand thread and is connected with a pressure-bearing disc arranged at the bottom of the anchor rod through a left-hand thread, and when the anchor rod is not in use, the anchor rod body is right-handed and rotated so that the anchor rod body is separated from the pressure-bearing plate; and a hollow lifting jack is used for pulling out the anchor rod body.
Owner:CENT RES INST OF BUILDING & CONSTR CO LTD MCC GRP +1

Device and method for flexible connection between masonry filler wall and main body frame

The invention relates to a device for flexible connection between a masonry filler wall and a main body frame. The device consists of a connecting member A and a connecting member B, wherein the connecting member A is embedded in a frame column and a frame beam, and the connecting member B is connected with the connecting member A through a sliding groove and a sliding block. During the building of the filler wall, firstly, the connecting member A is arranged on a rod placement of the frame, an opening of the sliding groove of the connecting member A is enabled to be tightly attached to a formwork, and then, concrete is poured; the formwork is removed when the concrete reaches design strength, and the connecting member B is connected with the connecting member A. During the building of a wall body, a fiber grille is cut out and is tiled in mortar, and the two end parts of the fiber grille are turned over along the height direction of edge building blocks so as to be embedded into next layer; after the building of the wall body is completed, a flexible sealing material is filled in gaps between the wall body and the frame. The connection between the filler wall built by the device and the main body frame is firm, out-of-plane is stable, and the earthquake resistance is high; the frame column and the filler wall do not interact, so that the problem that a major structure is affected by the filler wall built settlement is solved; in a structural earthquake-resistant design, a structural natural vibration period reduction coefficient is not required to be introduced, and thus the design is facilitated.
Owner:SHENYANG JIANZHU UNIVERSITY

Treatment method of plugging water stop construction for foundation pit dewatering well to penetrate through concrete base plate of basement

The invention discloses a treatment method of plugging water stop construction for a foundation pit dewatering well to penetrate through a concrete base plate of a basement. The treatment method comprises the following steps of producing a water stop steel sleeve pipe; casting bedding concrete of a basement base plate; cutting a dewatering well strainer on a cushion surface; winding the lower end of the water stop steel sleeve pipe with bituminous hemp fibers, then inserting into the dewatering well trainer, filling seams with cement mortar and sealing; constructing a waterproof layer on the cushion surface of the basement base plate; banding reinforcing steel bars on the concrete base plate, and continuously dewatering; casting basement base plate concrete, and continuously dewatering; ending dewatering for the dewatering well one by one; and plugging the dewatering well. According to the treatment method disclosed by the invention, the double-wing-ring water stop steel sleeve pipe is adopted and is inserted into a dewatering well mouth; a plugging structure of the well mouth has the advantages of simplicity, scientificity, reasonability, safety, reliability and good water stop effect, and can well adopt to dewatering requirements of the basement base plate construction under different working conditions; and the dewatering demand of the basement reinforced concrete base plate in the construction process is met, and the problem of water stop plugging of the dewatering well penetrating through the basement reinforced concrete base plate when the dewatering is ended is well solved.
Owner:CHINA FIRST METALLURGICAL GROUP

High-position beam falling construction method in box beam erection

The invention discloses a high-position beam falling construction method in box beam erection, and belongs to the technical field of bridge construction. The construction method includes the following steps that concrete pouring is carried out on a pier cap for the first time, and box beam storing and jacking conditions and jack operation conditions in the beam falling process are met; the box beam is erected to the designed position, and supporting base mortar is not poured; the box beam is jacked, a crane sling of a bridge girder erection machine is not disassembled first, and box jacking and beam falling exercise simulation is carried out on a jack assisted by the bridge girder erection machine; the bridge girder erection machine returns to a beam field, the box beam is jacked to be higher than the design elevation by 420 mm, and a steel plate layer is arranged on four points to support the bottom of the box beam; a continuous beam longitudinal stress tendon is tensioned; the beam falls from the high position to the designed position, and the supporting base mortar is poured; concrete pouring is carried out on the pier cap for the second time. The high-position beam falling construction method is easy to operate and capable of shortening construction period and reducing construction cost, and construction is convenient.
Owner:中铁十七局集团第三工程有限公司

Tunnel geological advance forecasting method based on mechanical energy nondestructive detection

The invention relates to a tunnel geological advance forecasting method based on mechanical energy nondestructive detection. The method is characterized in that seismic wave receiving points are distributed on a tunnel face and within range of two-meter-deep non-excavated surrounding rocks around the tunnel face, seismic wave excitation points are distributed on the tunnel axis of certain distance within an excavated range behind the tunnel face and the surrounding range or on a bottom plate parallel to the tunnel axis in turn, and a gasket plate is distributed on the position of each excitation point; and after drilling at the seismic wave receiving points, detectors are distributed in the hole bottoms, and the detectors are connected with a seismic wave acquisition instrument via signal transmission lines so that stable, controllable and safe mechanism energy is utilized to excite seismic wave under the premise of no damage to tunnel lining, seismic reflection wave is enabled to reach receiving holes in "first time" by reasonable distribution of the positions of the excitation points and receiving points and thus tunnel geological advance forecasting can be realized.
Owner:GANSU ZHITONG TECH ENG DETECTION CONSULTING CO LTD +1

High-temperature-resisting anti-corrosive thermal-insulation composite lining structural member and manufacturing method thereof

The invention discloses a high-temperature-resisting anti-corrosive thermal-insulation composite lining structural member and a manufacturing method thereof. The high-temperature-resisting anti-corrosive thermal-insulation composite lining structural member comprises a metal shell, a light thermal-insulation lining material layer, a cellucotton layer and an anchor nail, further comprises a dew-point corrosion preventing coating layer, and can also comprise high-temperature-resisting alloy-steel wires and a high-temperature-resisting fiber paper layer. The manufacturing method comprises the following steps of welding and fixing the head of the anchor nail on the inner wall of the metal shell body, blade-coating the dew-point corrosion preventing coating layer, applying the light thermal-insulation lining material layer, and spray-coating the cellucotton layer. According to the invention, a composite lining layer is formed by the dew-point corrosion preventing coating layer, the light thermal-insulation lining material layer and the cellucotton layer through a special structure, which play the roles of resisting high-temperature, preventing dew-point corrosion and insulating heat simultaneously, and ensures that the composite lining layer can be combined with a shell body of a thermal facility into a firm integer; meanwhile, the composite lining structural member has better strain property on expansion on heating and contraction on cooling, and makes petrochemical thermal power equipment be used for a long time in the reliable and economical premise.
Owner:陈海渊

Indoor building construction hoist

The invention relates to an indoor building construction hoist with an elevator shaft as a channel. The indoor building construction hoist comprises an elevator car, a main support and a falling protector. The elevator car is fixed to the main support. The main support is arranged on a guide rail support in a sliding manner. The guide rail support is fixed to a wall of the elevator shaft. An electric conduction sliding way is fixed to the wall of the elevator shaft. A drive mechanism making the main support and the elevator car integrally run up and down along the guide rail support is arranged between the main support and the guide rail support, and the electric conduction sliding way provides power for a motor in a gear and rack drive mechanism. The indoor building construction hoist is integrally installed in the elevator shaft of a building, and influences on usage of the hoist due to the severe weather can be avoided; the periphery space of a building body is not occupied, secondary construction of the building is not affected, and the construction cost is reduced; the guide rail support can be fixed to the inner wall of the elevator shaft joint by joint, and the safety coefficient is increased; installing is synchronously conducted along with construction of the building body, the utilization rate of the hoist is increased, and the building finishing time is shortened; and construction of peripheral protection facilities is eliminated, and cost input is reduced.
Owner:大泽建筑工程机械制造有限公司

Cyclic utilization and treatment method of fracturing backflow liquid

The invention discloses a cyclic utilization and treatment method of fracturing backflow liquid, relates to the technical field of fracturing reformation of oil and gas reservoirs and in particular relates to the cyclic utilization and treatment method of the fracturing backflow liquid. The cyclic utilization and treatment method comprises the following steps: removing macromolecular organic matters by utilizing microorganisms, so as to reduced COD (Chemical Oxygen Demand); adding efficient fungicide and killing bacteria in the backflow liquid; adding a metal ion removing agent, and removing divalent and trivalent metal ions in the backflow liquid; adding a deoxidant to remove residual gel breaking agent in the backflow liquid; adding a flocculating agent and carrying out flocculation and sedimentation; transferring supernatant into a clean water tank and enabling lower-layer flocculating liquid to enter a pressure filter for filtering; transferring filtrate into the clean water tank; adding a pH (Potential of Hydrogen) regulator, and inhibiting cross-linking effect of residual cross-linking agent. The method has the advantages of simple process, convenience for operation, high treatment efficiency, low cost, high field applicability and the like.
Owner:CHINA NAT PETROLEUM CORP CHUANQING DRILLING ENG CO LTD

Flexible connection device for masonry filler wall and main body frame and building method of filler wall

InactiveCN105649212AFirmly connectedEliminate Stiffness ContributionsBuilding material handlingShock proofingBody frameWelding
The invention discloses a flexible connection device for a masonry filler wall and a main body frame and a building method of the filler wall and belongs to the technical field of buildings. The flexible connection device comprises a connecting piece A capable of being embedded in the main body frame and a connecting piece B connected with the connecting piece A, wherein the connecting piece A is formed by arranging four symmetric L-shaped anchoring ribs on one side of a vertical plate, the connecting piece B is provided with a U-shaped clamping port capable of clamping the filler wall, a transverse plate is arranged at the bottom of the U-shaped clamping port, two symmetric tie holes are formed in the transverse plate, and the vertical plate of the connecting piece A is connected with a bottom plate of the U-shaped clamping port of the connecting piece B through on-site welding. The filler wall built by the aid of the connection device is firmly connected with the main body frame; a frame column is separated from the filler wall, mutual action between the frame column and the filler wall is blocked, the rigidity contribution of the filler wall to the concrete main body structure is eliminated, and the technical problem of the settlement effect on the main body structure due to building of the filler wall is thoroughly solved.
Owner:SHENYANG JIANZHU UNIVERSITY

Preparing method for styrene-free low-volatile-matter unsaturated polyester resin

InactiveCN105566577AGuaranteed StrengthGuaranteed curing speedCoatingsNitrogen gasPhotochemistry
The invention discloses a preparing method for a styrene-free low-volatile-matter unsaturated polyester resin. The preparing method is characterized by comprising the following steps: (1) adding dihydroxy alcohol, saturated and unsaturated diacid/dianhydride, dicyclopentadiene and a polymerization inhibitor according to a proportion; (2) introducing an inert gas nitrogen or carbon dioxide to remove air from a reactor; (3) starting stirring, raising the temperature to 80-90 DEG C, keeping a reaction for 1 hour, then slowly raising the temperature by controlling the temperature raising rate to be 10 DEG C per 10 minutes until the temperature reaches 160 DEG C, carrying out prepolymerization for 1 hour, controlling the temperature at a reflux condensed water knockout drum outlet to be 102 DEG C or lower, then raising the temperature to 200 DEG C, carrying out polycondensation and water knockout for 5-7 hours, raising the temperature to 210 DEG C when the resin acid value is reduced to 50 mgKOH/g, and continuing to react for 1 hour; (4) when the acid value is detected to be lower than 40 mgKOH/g, reducing the temperature to 100 DEG C, adding acrylate monomers for dilution, mixing uniformly, cooling, and then discharging. The styrene-free low-volatile-matter unsaturated polyester resin disclosed by the invention can be widely applied to prepare unsaturated polyester coating, and is free of styrene, so that the harm caused by styrene is overcome fundamentally.
Owner:HUNAN JINHAI SCI & TECH

Settlement test method for embankment filling construction

The invention relates to a settlement test method for an embankment filling construction. In the invention, a settlement plate is laid flat; a protective cover is placed above the settlement plate; the opening on the lower part of the protective cover faces a connecting steel tube on the settlement plate; the filling height of the embankment is flush with the top part of the protective cover; if the embankment uprises, then a cushion block is placed on the top part of the protective cover repeatedly; a box staff is spanned over any section of a settlement tube after taking away the protectivecover; and the elevation of the settlement plate is measured by using a balance level. The settlement test method for embankment filling construction overcomes the defects that a conventional construction vehicle must make a round when meeting a conduit extending out of a ground surface, and that the embankment settlement cannot be measured or cannot be measured accurately caused by easily breaking or bending the conduit. In construction, the settlement tube is embedded under a marked elevation of filling so as to prevent the construction vehicle from crashing the settlement tube aslant; a deformation space is reserved, the structure is simple, operation is convenient, construction is easy, cost is low and application effect is very good.
Owner:刘汉龙

Stereo heating and cooling house

A three-dimensional heating and cooling house relates to a house, in particular to a house with heating and cooling function. The roof and/or the wall and/or the floor are provided with a heating and cooling cavity and the heating and cooling cavity is provided with heating and cooling tubes. The two ends of the heating and cooling tubes are extended out from the cavity so as to form an inlet and an outlet of heating source and cooling source, the inlet and the outlet are covered with bushings, and a connecting pipe is arranged between the bushings. Because the roof and/or the wall and/or the floor are provided with a heating and cooling cavity, the hot fluid and the cold fluid flowing through the heating and cooling tubes utilizes the heat dissipation of the roof, the wall and the floor to emit the hot air or the cold air on one hand, and on the other hand a heat dissipation hole and a cold dissipation hole or a grate are utilized to emit the hot air or the cold air in the room, so the effect of heating and cooling is very good. The heating and cooling cavity has the advantages of low thickness, simple structure, low price, no influence on the normal construction of the house by building the cavity, good load bearing, low construction cost and good heating and cooling effect. The invention is used in the industrial and civil buildings with various heating and cooling requirements.
Owner:HUBEI SYNTHETIC SPACE TECH CO LTD

Directional drilling crossing pipeline outer coating structure and machining method thereof

The invention provides a directional drilling crossing pipeline outer coating structure and a machining method thereof. The directional drilling crossing pipeline outer coating structure is formed by wrapping the outer surface of a corrosion-resistant layer with a composite protection layer. The composite protection layer is made of pressure-resistant and friction-resistant composite materials formed by mixing resin, fibers and an additive, wherein the resin is photocuring composite resin, the fibers are made of epoxy glass reinforced plastic and / or dual-layer sintered epoxy powder, and the additive is a solvent-free epoxy abrasion-resistant coating. The composite protection layer has high mechanical damage resistance, and when directional drilling crossing encounters complex geological conditions and hard underground structures, damage to the corrosion-resistant layer can be avoided to the greatest extent. The directional drilling crossing pipeline outer coating structure can resist corrosion of a chemical solvent, the phenomenon that a thermal shrinkage sleeve is possibly disengaged in the construction process is completely avoided, and the effect of protecting a pipeline welding junction is greatly improved; and the curing time is short, construction is easy, the construction period is not affected, and the directional drilling crossing pipeline outer coating structure is not influenced by weather elements or field construction conditions, greatly saves manpower and material resources, is high in operability, is easy to implement and popularize, and has broad industrial application prospects.
Owner:SHAANXI YUYANG PETROLEUM TECH ENG CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products