Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

238results about How to "Low post-maintenance costs" patented technology

Construction method for large-area concrete weighbridge

ActiveCN102691401AOvercome the technical problem that the flatness is difficult to controlOvercome the problem of too much usageFlooringWater flowEngineering
The invention discloses a construction method for a large-area concrete weighbridge. The construction method comprises the steps of: dividing the locations of a construction water flowing section and a construction separation joint, erecting a weighbridge side template, installing a force transmission rod at a junction of the water flowing section, erecting a laser leveller, fixing a levelling staff, selecting a levelling base point, pouring concrete in a space surrounded by weighbridge templates, vibrating, compacting and levelling the weighbridge by the leveller, finishing surface conditioning and polishing of the concrete weighbridge before the final solidification of the concrete, maintaining the concrete weighbridge, cutting the construction separation joint within 24h, stuffing the construction separation joint and carrying out secondary maintenance. By the construction method, the technical problem that the whole levelling degree of the large-area weighbridge is very difficult to control is solved; the problems that the cost of later maintenance of the ground and the use quantity of the templates are very high since the construction joint of the large-area concrete weighbridge is very prone to breakage is solved; and the problems such as breakage along a warehouse dividing joint on the large-area concrete weighbridge, easy hollowing in the layered pouring of the weighbridge, easy cracking and the like are solved.
Owner:北京城建建设工程有限公司

Structure self-heat-insulation concrete wall plate and manufacture method thereof

The invention discloses a structure self-heat-insulation concrete composite wall plate and a manufacture method thereof. The wall plate comprises an internal concrete layer, an heat insulation core board, an external concrete layer and a reinforcement cage, wherein, the heat insulation core board is arranged between the internal concrete layer and the external concrete layer; an oblique reinforcement cage passing through the heat insulation core board connects the internal concrete layer and the external concrete layer into a whole; the reinforcement case comprises a reinforcement cage of the internal concrete layer, the oblique reinforcement cage and a reinforcement net of the external concrete layer. The wall plate concerns the 'heat bridge' effect passing through the oblique reinforcement of the heat insulation core plate, and ensures that the content of the heat insulation core plate can be determined by thermodynamic engineering performance of the composite wall plate. The wall plate can be manufactured flexibly and conveniently, can meet the requirement of building energy-saving design standard without an extra heat insulation measurements, overcomes the defects of external heat insulation of the prior external building wall, ensures the same service life of building heat insulation and main structure, reduces later maintenance cost for the heat insulation system of the building, is in accordance with the policies of energy conservation, emission reduction and sustainable development in China, and has good economic and social benefits.
Owner:ZHEJIANG UNIV

Rubber powder modified asphalt mixture and preparation method thereof

The invention discloses a rubber powder modified asphalt mixture and a preparation method thereof. The rubber powder modified asphalt mixture comprises coarse aggregate, fine aggregate, mineral powderand rubber powder modified asphalt, wherein the proportion of the rubber powder modified asphalt mixture is designed in a GTM method; and an oil-stone ratio of the asphalt mixture is 5.2 to 5.6 percent. The rubber powder modified asphalt is prepared from waste tire rubber powder and applied to the road construction, so that not only can the quality of the ordinary asphalt be effectively improved,and the pavement application performance be improved, but also the engineering construction cost can be reduced, and the project investment can be reduced. The rubber powder modified asphalt mixtureis designed on the basis of the GTM designing method, so that while the use amount of asphalt is reduced, the technical advantages of the material can be sufficiently played, the pavement performancecan be significantly improved, and the later maintenance expense can be reduced.
Owner:中铁十八局集团第五工程有限公司 +1

Environment-friendly inorganic soil solidification additive

The invention provides an environment-friendly inorganic soil solidification additive which comprises, by mass, 15-65% of sulfate, 15-65% of halide salt, 11-40% of phosphate, 5-30% of silicate, 0-25% of carbonate, 0-18% of basic oxide and 0-10% of lignosulfonate. The environment-friendly inorganic soil solidification additive is characterized in that all components in soil directly or indirectly undergo soil particle surface chemical modification and modification of substances among soil particles, and generation of colloidal gel materials and generation of various materials of crystal structures are promoted. As time goes, hardened skeletons such as ettringite needle-shaped crystals and apatite crystals appear gradually in solidified soil, soil solidification compressive strength, hydrophobicity, water permeability, stability of heavy metal and other harmful materials and other physical and chemical solidification effects are good, and the environment-friendly inorganic soil solidification additive can adapt to various climates, geographies and soil properties and is high in compatibility and obvious in stabilization and solidification effect on heavy metal and other harmful materials.
Owner:松田勤

Intelligent self-cleaning composite microporous electrostatic adherence air purifying device and control method

An intelligent self-cleaning composite microporous electrostatic adherence air purifying device comprises a voltage converter; electrode plates which are fixed and stacked at intervals through a supporting frame form column module groups; an electrostatic filtering channel is formed by arranging the column module groups; the air inlet end face of each column module group is provided with a ventilating and spraying clean device used for covering the corresponding air inlet end face; a control signal is received through a built-in control loop, the air inlet end faces are opened and closed, and therefore a channel and spray nozzles of a spray water source are provided; a multi-angle balance device is fixed to the top end of each column module group, the multi-angle balance device is coaxial with a supporting rotating shaft at the bottom of the column module group and is used for controlling the built-in control loop to receive the control signal, and each column module group is driven to swing slightly in the direction perpendicular to the air inlet or air outlet direction. According to the intelligent self-cleaning composite microporous electrostatic adherence air purifying device, the air quality can be monitored in real time, the purification efficiency can be fed back and adjusted in time, and the device is convenient to clean. Meanwhile, by means of an automatic washing function, the tedious manual dismantling and washing process can be omitted, the later-stage maintenance cost can be saved, and the service life of a product can be prolonged. The device has the functions of publishing the quality of purified air in real time and receiving authoritative data for forming a control command. The invention further discloses a control method.
Owner:上海迪安诺环境技术有限公司

Device and method for measuring furnace top charge level of bell-less blast furnace

The invention provides a device and a method for measuring a furnace top charge level of a bell-less blast furnace. The device comprises a blast furnace stock rod device. A stock rod is provided with a laser range finder, a gyroscope and a wireless communicator; the laser range finder and the gyroscope are arranged on the same plane in parallel side by side and form the same fixed included angle with the vertical charge level of the blast furnace stock rod device; and measurement data signals are sent to an external computer by the wireless communicator. The measurement method comprises the following steps: (1) starting all devices to enable the laser range finder to move downwards along the stock rod; (2) sending the measured data to the computer, and saving the descending height data ofthe stock rod to the computer; and (3) carrying out calculation by the computer by utilizing a trigonometric function formula, and saving a result. By adopting the device and the method for measuringthe furnace top charge level of the bell-less blast furnace, the multi-angle omnibearing stereoscopic measurement can be carried out on the shape of the furnace top charge level of the bell-less blast furnace without modifying furnace top equipment or mounting auxiliary measurement equipment. Moreover, the measurement process is safe and reliable, the measurement result has high precision, and the real-time performance is strong.
Owner:ANGANG STEEL CO LTD

Construction process of rubber powder modified asphalt pavement

The invention discloses a construction process of a rubber powder modified asphalt pavement. The process comprises steps as follows: quality control of raw materials, production and mixing of a rubberpowder modified asphalt mixture, transportation, paving, rolling and joint treatment. The rubber powder modified asphalt is prepared from waste tire rubber powder and is applied to highway construction, so that the quality of ordinary asphalt can be effectively improved, the pavement use performance can be improved, the engineering construction cost can be reduced, and the project investment is saved. The rubber powder modified asphalt mixture is designed on the basis of a GTM design method, technical advantages of materials can be fully played while the use amount of asphalt is reduced, thepavement performance can be notably improved, and the later maintenance cost can be reduced. In combination with the construction characteristic of the materials and in dependence on solid engineering, the proper construction process and quality control key points for the rubber powder modified asphalt mixture are proposed, and referential experience can be provided for future pavement construction of the rubber powder modified asphalt pavement.
Owner:中铁十八局集团第五工程有限公司 +1

Seismic-reducing floor slab with cavities

A seismic-reducing floor slab with cavities is characterized by comprising a floor slab (1), at least one cavity (2) preserved in the floor slab (1), and at least one damper (3) preset in the cavities (2). The dampers are scattered and distributed in the cavities of the floor slab so that the great benefit is to achieve seismic reduction and disaster prevention without affecting functional use of a building, and the seismic-reducing floor slab with cavities has the advantages of low manufacturing cost, easiness in construction, no maintenance and the like. The seismic-reducing floor slab with cavities has a fine seismic reducing effect for distance earthquakes, near earthquakes and even seismic centers.
Owner:HUBEI SYNTHETIC SPACE TECH CO LTD

Elevator ceiling and method for mounting same

ActiveCN102092622ANo longer limited by appearance sizeSimple structureBuilding liftsFixed frameDropped ceiling
The invention discloses an elevator ceiling arranged on a top plate of an elevator car. The elevator ceiling comprises a framework and lighting devices, wherein the framework comprises two fixing frames, two connecting frames and a plurality of lighting device mounting crossbeams; the two fixing frames are parallel to each other, and are respectively detachably connected with the top plate of theelevator car; the two connecting frames are parallel to each other and are respectively detachably connected with the two fixing frames; the lighting device mounting crossbeams are arranged between the two connecting frames, and are respectively detachably connected with the two fixing frames; and the lighting devices are arranged on the lighting device mounting crossbeams. The elevator ceiling has the advantages that: the height space of the elevator car is promoted in the aspect of vision, the appearance is attractive, the lighting efficiency is high, the elevator ceiling is convenient to detach and transport, light-emitting diode (LED) devices are suitable to be adopted and the maintenance cost is low.
Owner:杭州西子孚信科技有限公司

High-tenacity crack-resistant grouting cement mortar and preparing method thereof

ActiveCN105621990AImproves microscopic stress-strain performanceGood mechanical propertiesEpoxyCrack resistance
The invention belongs to the field of cement mortar preparing, and particularly relates to high-tenacity crack-resistant grouting cement mortar and a preparing method thereof. The mortar comprises 80-100 parts of cement, 120-180 parts of 50-200-mesh silver sand, 20-50 parts of water, 5-10 parts of polyurethane solutions, 5-10 parts of epoxy resin emulsion, 10-15 parts of toughening composite materials, 1.5-6 parts of early strength agent, 2-9 parts of methacrylic acid, 2-6 parts of calcium formate, 2-8 parts of neopentyl glycol, 0.2-0.8 part of sodium dodecyl benzene sulfonate and 0.9-2.4 parts of water reducing agent. As toughening composite materials are added into the cement mortar, whole concrete has good tenacity, good isotropy and good fatigue resistance, the crack resistance of the grouting mortar is better facilitated, tenacity is improved, and the later-period maintenance cost of engineering is reduced.
Owner:福建省东霖建设工程有限公司

Vacuum preloading and soil body surface solidification combined processing technique

The invention discloses a vacuum preloading and soil body surface solidification combined processing technique. The vacuum preloading and soil body surface solidification combined processing technique includes the following steps that A, a vertical water discharging plate is arranged in a hydraulic reclamation mud / sludge / waste mud pit; the upper end of the vertical water discharging plate is connected with a water discharging pipeline; the water discharging pipeline is connected with the outside; sealing cloth coves the top of soil in a vacuum preloading water reduction pit and the water discharging pipeline; the edge of the sealing cloth is sealed through a sealing structure and soil; a vacuum pump is connected with the water discharging pipeline and used for pumping water in the soil; B, after vacuum preloading is finished, the vacuum sealing cloth on the surface is removed; C, curing agents are added to the soil body on the surface layer and evenly distributed in the soil body on the surface layer; D, after a period of time, the soil body is solidified. The soil body processed through the technique is high in dehydration rate, short in work period and higher in strength after the soil body is processed.
Owner:WENZHOU UNIVERSITY

Distributed wireless access control system and application method thereof

The invention provides a distributed wireless access control system and an application method thereof. The distributed access control system comprises a network server layer composed of a network server and a third party platform interface, an area management layer composed of a local terminal connected with the network server in a TCP / IP manner and a ZigBee coordinator connected with the local terminal by virtue of a serial port, a ZigBee wireless network transmission layer composed of multiple ZigBee terminal nodes wirelessly connected with the ZigBee coordinator by virtue of a ZigBee routerand an access control node control layer composed of an access control node controller connected with the ZigBee terminal nodes by virtue of a serial port. The invention provides a flexible, effective, convenient and intelligent access control system, access control underlying data communication is realized on the basis of a ZigBee wireless sensor network, a distributed architecture is adopted, working areas can be independently managed by virtue of a local computer or tablet computer, multiple independent working areas also can be managed by virtue of a remote server, and independent workingareas also can operate normally when a remote management system is in fault.
Owner:XIAMEN UNIV TAN KAH KEE COLLEGE

Transfer station precision optimization method for an aircraft assembly large-size multi-station measurement field

ActiveCN109871664AOptimization of transfer station accuracyReduce layoutComplex mathematical operationsControl theoryMeasurement precision
The invention discloses a transfer station precision optimization method for an aircraft assembly large-size multi-station measurement field. The method is characterized in that on the basis of TB / ERSpoint and other transfer station reference points which are commonly used for aircraft assembly; A temporary transfer station enhancement point without a theoretical value is introduced, and two or more measurement stations are used for measuring the transfer station enhancement point at the same time, so that the transfer station adjustment constraint between the different measurement stations is increased, and the transfer station parameter variance-of the measurement stations towards the assembly global station is reduced. The covariance matrix improves the transfer station precision. Themethod is characterized in that 1) optimization of the transfer station precision is realized by increasing the arrangement number of transfer station reference points such as TB / ERS points, and the arrangement and later maintenance costs are greatly reduced due to the fact that transfer station enhancement points do not have theoretical values; 2) the transfer station enhancement point can be temporarily and flexibly arranged according to the measurement precision requirement difference of different areas of the to-be-measured component and the field measurement openness condition, so that the use is convenient;
Owner:NANJING UNIV OF AERONAUTICS & ASTRONAUTICS

Flexible ecological bank protection structure and construction method thereof

The invention discloses a flexible ecological bank protection structure and a construction method thereof. The flexible ecological bank protection structure comprises a bank slope toe protective structure and a bank slope surface protective structure; the bank slope toe protective structure comprises a log-willow branch anchoring cage, the log-willow branch anchoring cage is weaved from log anchoring piles, cuttage willow branch anchoring piles and fresh wickers, the anchoring cage is filled with gravel and sandy loam soil, and the air face of the anchoring cage fits backfill sandy loam soil layers; the bank slope surface protective structure is composed of the fresh wickers and the slope surface sandy loam soil layers, the fresh wickers uniformly are paved on the bank slope surface, the thick ends of the fresh wickers are inserted into the sandy loam soil layers adjacent to the air face of the anchoring cage, and the slope surface sandy loam soil layers refer to the backfill coveringon the surface of the wickers. According to the flexible ecological bank protection structure and the construction method thereof, the collapse of the bank slope can be prevented, corrosive materialscan provide nutrients for plant growth, the formed root systems improve the stability of the bank slope, local materials can be taken, the service life is long, the vegetation coverage and shielding water areas of the bank slope are improved, habitat space is provided for animals, and the ecological and landscape benefits in the region are improved.
Owner:BEIJING FORESTRY UNIVERSITY

Method for constructing external walls

The invention discloses a method for constructing external walls. The method includes steps of 1), arranging pouring formworks on two sides of each shear wall to be poured, and integrally connecting the pouring formworks on the two sides of each shear wall with each other by opposite pull lead screws; 2), pouring concrete between the formworks on the two sides of each shear wall, allowing the poured concrete to be formed to obtain the shear walls, detaching the opposite pull lead screws and the formworks on the two sides of each shear wall and allowing indoor and outdoor through holes to be formed in certain positions of the shear walls; 3), plugging opening ends of the outsides of the holes by rubber plugs; 4), injecting cement mortar or foaming agents in the holes from opening ends of the insides of the holes and enabling the holes to be compactly filled with the cement mortar or the foaming agents; 5), laying bricks to form brick walls between the adjacent shear walls and forming the integral external walls by the brick walls and the shear walls in an enclosed manner; 6), plastering internal wall surfaces of the external walls; 7), plastering external wall surfaces of the external walls. The opposite pull lead screws are detached from the certain positions of the shear walls. The method has the advantages that a process for plugging the holes is easy to operate and can be monitored, waterproof effects can be effectively guaranteed, the later maintenance cost can be saved, and the method has an excellent popularization and application prospect.
Owner:CHINA METALLURGICAL CONSTR ENG GRP

Steel-wood combined bridge structure with pored steel plate connecting piece

The invention discloses a steel-wood combined bridge structure with a pored steel plate connecting piece. The steel-wood combined bridge structure comprises an upper bridge structure, a lower bridge structure, a wood bridge panel formed by splicing a plurality of rectangular wood plates, and a bottom bearing structure located right below the wood bridge panel, wherein a plurality of pored steel plates are sandwiched in the wood bridge panel; the bottom bearing structure comprises a plurality of lower longitudinal beams distributed on a same plane and a plurality of lower cross beams distributed on a same plane; the pored steel plates and the lower longitudinal beams are identical in number, and the plurality of pored steel plates are respectively fastened right above the plurality of longitudinal beams; and the plurality of rectangular wood plates and the plurality of pored steel plates are assembled into a whole through transversely distributed prestress steel bundles, and the plurality of pores steel plates and the prestress steel bundles jointly bear the shear force and the lift force among the steel-wood structure. The steel-wood combined bridge structure disclosed by the invention has the advantages of simple structure, convenience for construction, definite stress, reliability in connection and good use effect, and various defects of the traditional steel-wood combined bridge can be overcome while the spanning capability of the wood structure bridge is increased.
Owner:CHANGAN UNIV

Prefabricated toilet floor slab construction method

InactiveCN111827665AGood leak-proof and seepage-proof performanceAvoid destructionFloorsForms/shuttering/falseworksFloor slabArchitectural engineering
The invention provides a prefabricated toilet floor slab construction method, and relates to the technical field of fabricated toilets. The prefabricated toilet floor slab construction method comprises the steps of assembling and reinforcing a bottom plate pouring formwork and a reverse sill pouring formwork, arranging floor slab reinforcing steel bars on the bottom plate pouring formwork, installing positioning convex columns on the floor slab reinforcing steel bars, sleeving the positioning convex columns with water stop joints, pouring concrete to the bottom plate pouring formwork to form abottom plate, pouring concrete to the reverse sill pouring formwork to form a reverse sill, and dismantling the bottom plate pouring formwork and the reverse sill pouring formwork. The reverse sill pouring formwork comprises a reverse sill outer form and a reverse sill inner form, and a plurality of water supply and drainage pipeline groove pressing molds are arranged on the inner side of the reverse sill inner form at intervals. The floor slab reinforcing steel bars are provided with steel bar extending parts extending towards the periphery. The bottom plate and the reverse sill of the toilet floor slab are integrally poured and formed, so that the leakage-proof and seepage-proof performance is better, and the situation that the leakage-proof and seepage-proof performance of the toilet floor slab is affected by cold joints due to the fact that the bottom plate is poured firstly and then the reverse sill is poured on the basis of the bottom plate is avoided.
Owner:THE THIRD CONSTR CO LTD OF CHINA CONSTR THIRD ENG BUREAU

Environment-friendly water permeable brick as well as compression forming mould and preparation method for preparing environment-friendly water permeable brick

The invention provides an environment-friendly water permeable brick as well as a compression forming mould and a preparation method for preparing the environment-friendly water permeable brick. The water permeable brick is formed by a water permeable brick surface layer and a water permeable brick base layer, wherein materials of the surface layer mainly comprise sand with the particle size being 10 to 20 mesh and cement; materials of the base layer mainly comprise large gravel with the particle size being 3 to 8mm and cement. The method specifically the steps of adding the materials into two stirring machines respectively, adding other materials of corresponding formulas for evenly stirring, then compressing by a brick compression forming machine, distributing the base layer materials twice and the surface layer materials once in a lower mould hollow part of the compression forming mould, performing shaking compression for 2 to 3s after each time of material distribution, thus preparing a formed green brick, and then performing curing to form the water permeable brick. A dry-press forming process is adopted to prepare the water permeable brick, so that the production cost and the energy consumption are reduced; the prepared water permeable brick has good water permeability, abrasion performance, skid resistance and crushing resistance.
Owner:武汉车都环保再生资源有限公司

Construction method of water purification type ecological protection bank

The invention discloses a construction method of a water purification type ecological protection bank. The construction method of the water purification type ecological protection bank comprises the following steps of a, opening a foundation pit; b, dividing regions; and c, building the ecological protection bank. According to the construction method of the water purification type ecological protection bank provided by the invention, through designing a fixed support and an installation plate, the top part of the ecological protection bank can be further installed and fixed, so that the structural strength and the structural stability of the ecological protection bank are improved, and the ecological protection bank can resist the impact force of a water flow; meanwhile, when bottom-layerecological building blocks are paved, through designing reinforced gear blocks, not only can the structural strength of the bottom-layer ecological building blocks be ensured, but also the contact strength between the bottom-layer ecological building blocks and soil can be improved, so that the ecological protection bank is not easy to deform; meanwhile, each two adjacent ecological building blocks can be spliced and further connected and fixed through fixed screws, so that the connecting strength between the adjacent ecological building blocks is effectively ensured; and an auxiliary plantinghole is formed between each two adjacent ecological building blocks and is matched with ecological planting holes of the ecological building blocks, so that a greening area of the ecological protection bank is enlarged.
Owner:ZHEJIANG UNIV OF WATER RESOURCES & ELECTRIC POWER

A non-destructive bridge deck concrete pavement layer crack treatment construction method

The invention discloses a non-destructive bridge deck concrete pavement layer crack treatment construction method. the method comprises the following steps: (1) carrying out surface sealing treatmentfor cracks with a width not greater than 0.15 mm, sealing with special epoxy resin glue or cement slurry, spreading a layer of hot asphalt after surface sealing, and laying anti-cracking base cloth for waterproofing treatment; (2) For the cracks between 0.15 mm and 3 mm in width, the epoxy resin glue is poured into the cracks by pressure grouting method. The technological steps are as follows: design hole arrangement-drilling -air blowing hole cleaning-embedding needle and sealing cracks-preparing grouting fluid-grouting-inspection. The invention aims at overcoming the shortcomings of the prior bridge deck concrete pavement layer that the structure is safe, dust and construction waste are caused, the construction cost is high, and the effect is not ideal, and provides a non-destructive bridge deck concrete pavement layer crack treatment construction method with low cost of crack treatment, environmental protection safety and reduced maintenance cost in the later period.
Owner:CHINA HYDROPOWER ELEVENTH ENG BUREAU ZHENGZHOU CO LTD +1

Bearing platform waterscape

The invention discloses a bearing platform waterscape including stainless steel sheets, a pool surface stone material(2), a stainless steel frame (3), a stainless steel structure (5), a concrete pool wall (12) and a concrete floor plate(13); a broken stone hardcore (11) and a concrete leveling layer (10) are paved successively on the concrete floor plate (13); the stainless steel structure (5) is mounted on the inner side of the concrete pool wall (12), is fixed onto the concrete leveling layer (10), and is connected by a pre-embedded part; the stainless steel sheets are laid on the surfaces of the concrete leveling layer (10), the stainless steel structure(5) and the concrete pool wall (12) to form a stainless steel liner(4) through welding. The bearing platform waterscape solves the difficult problems of easy leakage of traditional waterproof construction of a pool, repair difficulty after the leakage, and the like, reduces the later repair costs of the pool, and fundamentally eliminates water leakage, water seepage and other hidden troubles of an indoor pool.
Owner:GOLD MANTIS CONSTR DECORATION

Flock filling machine

The invention provides a flock filling machine which comprises a flock holding box, an induction pipe, a connecting pipe, a filling pipe, a three-way valve and an air compressor, wherein the flock holding box is communicated with the induction pipe; the induction pipe is communicated with the filling pipe through the connecting pipe; an annular groove is circumferentially arranged on the outer wall of the connecting pipe, an air hole communicated with the filling pipe is formed on the side wall of the annular groove adjacent to the filling pipe; the three-way valve is sleeved on the connecting pipe by sealing, and forms an air inlet channel with the annular groove; the air inlet channel is communicated with the air hole, and an air inlet of the three-way valve, communicated with the air compressor, is communicated with the air inlet channel. The flock filling machine has the advantages that each component is cheap and easy to obtain, especially, the connecting pipes of key components and the air compressor can be directly obtained by disassembling discarded or temporarily unused inspiration equipment, therefore, the component cost is low, and reuse of devices can be realized; both the mounting and the disassembling are simpler, and the expense for late stage maintenance is lower.
Owner:ANTA CHINA

Road information real-time monitoring and display system

The invention provides a road information real-time monitoring and display system, at least comprising: an environment detection module used for collecting road information and including a gas detection device, a temperature and humidity sensor, a noise sensor and a water level sensor; a data collection module used for receiving the output signal of the environment detection module; a central processing module used for receiving the output signal of the data collection module; a backstage control module used for carrying out data communication with the central processing module; a column usedfor providing an installation support for the environment detection module, the data collection module and the central processing module; a display module used for displaying the road information; anda power supply module used for providing power for the environment detection module, the data collection module, the central processing module and the display module. With the system adopted, whetherthe amount of a specific pollutant exceeds the standard, the pollution law and the level of water on the road can be known, and a scientific basis is provided for the monitoring, evaluation and prevention of air pollution to urban roads and the work of flood prevention and water logging prevention. The road information real-time monitoring and display system has good social benefit.
Owner:CHENGDU CAIZHI SHENGYOU TECH LLC

Heat insulation building material

The invention relates to a heat insulation building material which comprises the following raw materials by mass percent: 20-40% of fine sand, 30-50% of cementing material, 10-40% of heat insulation material, 10-30% of mineral admixture and 5-10% of other auxiliary materials. A production technology of the heat insulation building material comprises the steps of mixing and stirring a shell cementing material, producing foam concrete, cutting and fixing the foam concrete and a heat insulation core body of a polystyrene foam plastic board, pouring, vibrating and molding shell slurry, and maintaining building blocks. The heat insulation building material can be used for replacing a great deal of solid clay bricks, thus saving a great deal of energy and land for China, being capable of consuming a great deal of industrial solid wastes and being beneficial to the environmental protection. The produced construction product has the excellent characteristics of being good in heat insulation property, light in self weight, high in strength, waterproof, impervious, low in shrinking percentage, long in service life, simple in construction and the like, thus being beneficial to the development of building energy conservation.
Owner:肖新颖

Method for relieving annular belt pressure of natural gas and gas storage well

The invention discloses a method for relieving annular belt pressure of natural gas and a gas storage well. The method comprises the following steps that according to the sizes of a production casing and an oil pipe, the size of an annular clearance, the well depth and the formation pressure, by predicting the change values of the temperature and pressure of the natural gas during production, the amount of expansion or contraction, caused by the temperature and pressure effects, of protection liquid, the production casing, the oil pipe and the like is calculated; according to a calculated result, inert gas (such as nitrogen) with a certain length and pressure is injected into a wellhead portion in an annular space between the production casing and the oil pipe; when the temperature and pressure of the natural gas in the oil pipe rise or drop, the production casing and the oil pipe expand or contract, and meanwhile expansion or contraction of the protection liquid in the annular space can also be caused; the change causes compression or expansion of the inert gas (such as nitrogen), but the pressure at an annular wellhead does not change obviously, so that wellhead equipment, the production casing, the oil pipe, a sliding sleeve, a packer and the like are protected.
Owner:BC P INC CHINA NAT PETROLEUM CORP +2

Color temperature calibration method and mobile terminal

The invention provides a color temperature calibration method and a mobile terminal, and the method comprises the steps: detecting whether color decay happens to a to-be-calibrated display screen or not; obtaining the current RGBW data of the display screen when the color decay is detected to happen to the to-be-calibrated display screen; adjusting the RGB components according to the current RGBWdata and a predetermined color temperature, wherein the RGB components are the basis that the display screen displays a white picture. Therefore, the calibration operation of the color temperature isnot carried out at the display screen according to the scheme of the invention, but is carried out at the mobile terminal side, so MTP does not need to be carried out in the whole calibration processfor many times, thereby saving the subsequent maintenance cost, and simplifying the complex operation.
Owner:VIVO MOBILE COMM CO LTD

Repair construction method of plain brick wall of ancient building

The invention relates to a repair construction method of a plain brick wall of an ancient building. The method is characterized in that under the condition that the original wall foundation is not damaged and the historical original appearance of a part of the wall is reserved, modern materials and technologies are combined with the traditional construction process, through calculation of the loadof the wall, design of a structure through beam, reinforcing of the wall foundation, dismantling and rebuilding, and local repairing, the repaired old wall of the ancient building is more stable anddurable, and the relatively complete historical features remain. By adopting the repair construction method disclosed by the invention, the plain brick wall of the ancient building has good durabilityafter being repaired, the later maintenance cost is saved, the streamlined construction can be realized, the productivity is improved, and good economic benefits and social benefits are obtained.
Owner:SHANGHAI GARDEN ENG CO LTD

Windproof dust inhibiting net

The invention relates to a windproof dust inhibiting net which is integrally in a net-wall structural form. The windproof dust inhibiting net comprises a ridge wall, a plurality of capped piles, a steel support and a windproof net piece, the ridge wall is built on a foundation by adopting bricks, the capped piles are arranged on the side face of the ridge wall, height of the ridge wall is larger than that of each capped pile, the steel support is fixedly mounted on the capped piles by adopting embedded anchor bolts, the ridge wall is in a form that a brick-built wall body is combined with a capping beam, the steel support is formed by welding H-shaped steel columns and seamless steel pipe inclined struts, a reinforcing plate and a supporting plate are welded on the H-shaped steel columns, a steel tie bar and a steel brace are arranged in span of the steel support, and the windproof net piece is fixedly mounted on the steel support by adopting a self-tapping screw. The windproof dust inhibiting net is firm in structure, good in windproof effect, low in anticorrosion measure and subsequent maintenance cost and suitable for coastal or humid areas and reaches 95% in dust inhibiting rate.
Owner:杜秀枫

Mold for producing concrete pipes

The invention discloses a mold for the production of concrete pipes. The mold may include a cylindrical mold main body, the cylindrical mold main body is made of a steel plate rolled into a circle and has two ends open; the outer side of the cylindrical mold main body is provided with a plurality of Annular reinforcing ribs and multiple transverse reinforcing ribs and / or multiple longitudinal reinforcing ribs; the main body of the cylindrical mold is provided with a hoisting turning shaft. The mold for concrete pipe production provided by the application has the advantages of less investment, high efficiency, energy saving and environmental protection, and low maintenance cost in the later period. The mold continues to use the mature suspension roller process, and also combines the advantages of mandrel vibration and radial extrusion for vertical maintenance and quick demoulding, ensuring that customers have less investment, do not violate environmental protection, low maintenance and maintenance costs, and produce high-quality products. The product is of good quality. So that customers in need can achieve high-efficiency production mode on the basis of small investment in suspension roller technology. It is worth promoting and using on a large scale.
Owner:张波

Gravity shuttling type intensive warehousing method and device

The invention relates to the technical field of logistics and warehousing, and particularly to a warehousing method and device of intensive warehouses with cargo pallet for storage, warehousing and ex-warehousing. The warehousing device comprises parallel multilayer through storage channels supported by beams and vertical posts, wherein a warehouse entrance and a warehouse exit are arranged at two ends of each through storage channel; an unpowered roller way and an orbit having a certain included angle alpha with a water level are arranged inside each through type storage channel; each orbit is provided with a tablet shuttle car; and a deceleration separation device is arranged at the terminal end of each orbit close to the warehouse exit. The tablet shuttle car is adopted to convey a cargo pallet so as to put the cargo pallet into the warehouse; and a gravity conveying type intensive warehousing way is adopted for warehousing and ex-warehousing. According to the invention, stability and effectiveness of cargo pallet in-warehousing, intensive warehousing and ex-warehousing are guaranteed, cost is lowered, convenience is brought about to the later-period maintenance, and market promotion is facilitated.
Owner:BLUESWORD INTELLIGENT TECH CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products