Prefabricated assembled box culvert and construction method thereof
A technology of prefabricated assembly and construction method, applied in the direction of buildings, road bottom and other directions, can solve the problems of long construction period and difficult quality control of culverts, and achieve the effect of shortening design time, shortening construction period and shortening construction period.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0038] Application of Prefabricated Box Culvert in Yecheng-Moyu Highway Construction Project
[0039] (1) Project introduction: This project is located at the northern foot of the Karakorum Mountains in the Xinjiang Uygur Autonomous Region and the southern edge of the Tarim Basin. The route connects Yecheng in Kashgar, Pishan County and Moyu County in Hotan, with a total length of 227km.
[0040] The length of this reconstruction is 182km. The whole line adopts the secondary road standard. The project started in 2008 and was completed in 2010 with a construction period of two years.
[0041] (2) Application of results in the research stage: prefabricated box culverts, steel bellows culverts
[0042] (3) The project is divided into five contract sections. The fifth contract section is located in the farmland area, the surface is mostly fine-grained soil, and the bearing capacity of the foundation is low. Therefore, this time, the fifth contract section chose the higher part...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com